AMENDMENT 0003: The purpose of this Amendment is to Extend the Offer Due Date.
AMENDMENT 0002: The purpose of this Amendment is to Extend the Offer Due Date.
AMENDMENT 0001: The purpose of this Amendment is to Answer Vendor Questions.
SITE VISIT
A site visit is scheduled for 11/5/2026 at 1:00 pm Local Time at 3551 Combine St., Paso Robles, CA 93446. Please provide the name and phone number for all attendees at least two (2) days prior to Bruce Kane, Bruce.CTR.Kane@faa.gov, Mobile: 817-300-6674.
Information provided at the site visit, as well as answers to questions will not change/qualify the terms and conditions of the solicitation and specifications. Terms remain unchanged unless the solicitation is amended in writing.
The Federal Aviation Administration (FAA) is issuing Screening Information Request (SIR) Number 697DCK-27-R-00022, Design Renovation, System Support Center (SSC), 3551 Combine St., Paso Robles, CA, 93446 as supplemented with additional information included in this notice.
OFFER SUBMISSION
Send your offer to Linda.Hennequant@faa.gov. Reference provision L02 REQUIRED DOCUMENTS for specific submission requirements.
Please reference the Solicitation number in all correspondences to ensure prompt and proper processing. Emails with attachments that do not reference a SIR number in the subject line or the body of the message, will be disregarded to prevent the spread of computer viruses.
BASIS OF AWARD
The Government intends to make award based on successful negotiation of price and conformance with solicitation terms and conditions to the offeror that is considered to be the lowest priced, responsible offer. The Government will evaluate the Offeror’s proposed prices for fairness and reasonableness.
Thank you for your interest in our procurement opportunity.
ATTACHMENTS
RFP 697DCK-27-R-00022A, 48 pages
SOW - Paso Robles CA SSC Design, 3 pages
Paso Robles SSC DID 60226, 6 pages
Form Past Performance/Experience Info, 1 page
The contractor must use the provided Design Intent Drawings (DIDs) as the basis for completing MEP/LS/FP documents for permitting and construction. The scope includes design and analysis of HVAC, power distribution, water systems, and fire safety infrastructure. Deliverables include stamped MEP/FP drawings, a life safety sheet, and hydraulic and load calculations. The contractor must submit final drawings to the City of Paso Robles, revise any changes, and obtain final approval of design drawings stamped by the city. The schedule includes a site survey due within 7 days of NTP, 50% design drawings due within 4 weeks, 90% design drawings due within 3 weeks of FAA review, and final permit-ready drawings due within 10 weeks of NTP.
We post new architecture and design opportunities in California as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""US""76177""FORT WORTH""TX""USA""AAQ-500, FAA SW REGIONAL OFFICE""10101 HILLWOOD PKWY""21 Amendment 0003 697DCK-27-R-00022A.pdf"163991"file"".pdf""1""2026-11-05T19:19:20.082+00:00""7aa2e805d81e42349ff739a1888ef6b3""public""0""public""2646018aa8654f068e06664ea65bbb0f""0"7"0""21 Amendment 0002 697DCK-27-R-00022A.pdf"393439"file"".pdf""1""2026-11-03T18:01:45.059+00:00""464f0bc0617d419a9cab0cc7b401452e""public""0""public""d798c576b30644bb89a0cfc45f3b1b8e""0"6"0""21 Amendment 0001 697DCK-27-R-00022.pdf"163665"file"".pdf""1""2026-10-28T17:55:43.838+00:00""1cf70c55c1f2437e8c6e5b50dc67d62c""public""0""public""96b1dfd37e404553888d56d1e24d178e""0"5"0""06a A01 SOW Design_Paso Robles SSC.pdf"219091"file"".pdf""1""2026-10-26T16:28:57.03+00:00""5cc357cba34d4871af46dcce092cec3f""public""0""public""0284792b31ce414b90ad773234421b9e""0"4"0""06a A02 SOWa A01 DID-Paso Robles SSC DID 60226.pdf"9395867"file"".pdf""1""2026-10-26T16:28:57.03+00:00""b146a1a1a7fd4cfeb4ce74114e21709a""public""0""public""2fcc1c4390ec42f8aea5d0b1ab70f183""0"3"0""06 SIR 697DCK-27-R-00022A.pdf"1204773"file"".pdf""1""2026-10-26T16:28:57.03+00:00""10d554a8baf74022bd010bb9fc7a604d""public""0""public""0ccbecb1e2554818a3339633d198d6dd""0"2"0""06a A03 Form Past Performance_Experience Info.pdf"230950"file"".pdf""1""2026-10-26T16:28:57.03+00:00""0c979a3482834b11a8875fe2baa65f94""public""0""public""2ebbf1040fa845709c89c7d973383e1b""0"1"0"Most California work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 9623e44ddbac4b45a2fe2d8234d99879), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.