The project is located along the left descending bank of Lake Sharpe near the Lower Brule, SD town site. Lower Brule North Element 2 includes a 100-foot-wide riparian planting bench, a gravel maintenance path along the entire reach, a riprap revetment to protect the shoreline and island from erosion, and the creation of a 200-by-1,500-foot island constructed in water up to three feet deep. The sheltered open water area between the island and the shoreline will develop into approximately 5.17 acres of emergent wetland, and this will also create approximately 32 acres of riparian habitat.
Related tasks include earth moving, grading, bank shaping, rock installation, water management, fill, and topsoil placement.
Lower Brule North Element 2 includes a 100-foot-wide riparian planting bench, a gravel maintenance path along the entire reach, a riprap revetment to protect the shoreline and island from erosion, and creation of a 200-by-1,500-foot island constructed in water up to three feet deep to develop approximately 5.17 acres of emergent wetland and approximately 32 acres of riparian habitat, with earth moving, grading, bank shaping, rock installation, water management, fill, and topsoil placement.
We post new excavating opportunities in Nebraska as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"68102-4901""OMAHA""NE""USA""KO CONTRACTING OFFICE""1616 CAPITOL AVENUE""https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W9128F27BA007¬iceType=SolicitationNotice"0"link""1""2026-10-26T18:34:57.625+00:00""0b0cd7a0cd0a4c96aaf14a84147625e7""public""0""PIEE Solicitation Module Link for W9128F27BA007""public""9a180fcc03e74b0f8680e104c640f3cf""0"4"0""https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml"0"link""1""2026-10-26T18:34:57.625+00:00""cadcc7cae5df417daa7fee34d78b71aa""public""0""Web Based Training for the PIEE Solicitation Module""public""b7827738461f40c3806fcc06ca04ad31""0"3"0""https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf"0"link""1""2026-10-26T18:34:57.625+00:00""55276a3ce7c54d5cbf12dd9642f104ae""public""0""Registration Instructions for the PIEE Solicitation Module""public""c5bd1daba7744702a20d97e942c3ae2e""0"2"0""https://toolbox-piee.eb.mil/"0"link""1""2026-10-26T18:34:57.625+00:00""ea4d8d57b1e54f6cafebeb19edf99ef2""public""0""Department of Defense Procurement Toolbox""public""5d2babba2dd34002b0ae68a7dab3a730""0"1"0"Most Nebraska work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 95fa52a04ea9432a87be7fd6d1949b12), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.