Horizontal Front-Loading, Internal Gas Quench Vacuum Furnace.
PIEE Solicitation Module Link for full
The contractor must furnish and deliver a brand-new Horizontal Front-Loading, Internal Gas Quench Vacuum Furnace conforming to SAE AMS 2750G and NFPA 70, 79, and 86D. The furnace must include a double-walled water-cooled 304 stainless steel chamber, an all-metal insulated hot zone with an all-metallic shield pack, a usable work zone of 12" (W) x 12" (H) x 18" (D), and a minimum hearth capacity of 250 pounds. Performance requirements include a maximum operating temperature of 2400°F, a maximum cleanup cycle temperature of 2500°F, temperature uniformity of ±10°F at specified points, ultimate vacuum in the 10⁻⁶ Torr range, operating vacuum in the 10⁻⁵ Torr range, and a leak-up rate of less than 5 microns per hour. The vacuum pumping system must include a mechanical roughing pump (min. 35 SCFM), a high-vacuum diffusion pump (min. 6"), and a holding pump with automatic fail-safe interlocking. The gas quenching/cooling system must have a minimum 7.5 HP motor for 2 bar (15 PSIG) positive pressure cooling using Nitrogen or Argon. A partial pressure system for Nitrogen and Argon, a closed-loop water cooling system with a minimum 40 GPM pump station, power-loss diaphragm backup pump, and minimum two dry coolers with 460V controls are required. The control system must include an Allen-Bradley (or equivalent) PLC with HMI touchscreen, data logging for temperature uniformity verification, and an SCR-controlled hot zone power supply rated for a minimum of 65 KVA. A manual load truck for loading/unloading is required. The contractor must provide operator and maintenance training at no additional charge, and deliver digital copies of operation/maintenance manuals, manufacturer's manuals, mechanical/electrical drawings, and a recommended spare parts list.
We post new goods & materials opportunities in Tennessee as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"37389-1332""ARNOLD AFB""TN""USA""CP 931 454 7841""100 KINDEL DR STE A332""FA910127QB008.pdf"521550"file"".pdf""1""2026-11-17T18:44:11.452+00:00""cefa63e96ec745078bcaa739acb1642c""public""0""public""2f676fb01d3d441381f1a7bedc315d5e""0"2"0""Specifications_Sheet__Vacuum_Relief_Furnace (002).pdf"778805"file"".pdf""1""2026-11-17T18:44:11.452+00:00""8be59c65c8ba4ae5bc5f127ed8d31852""public""0""public""bf5b02dd9b1e413e8229cce4ca9c1b30""0"1"0"Most Tennessee work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what an agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 91abb52c7e3c4fe0b87c6623eabb9575), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.