**Naval Surface Warfare, Carderock Division (NSWCCD), has procurement request for Acoustic Testing for the IM-272A/WDQ Air Particle Detector and isolation valves with option. See Performance Work Statement (PWS) for detailed description. **
Amendment 0001 - Extend the due date from 9/21/2026 at 11:00 AM to 9/24/2026 at 1:00 PM.
Amendment 0002 - The Solicitation for quotes is hereby postponed. See amendment 0002 for description.
The contractor shall implement acoustic dampening measures on two IM-272A/WDQ APD units to reduce their sound profile and meet the acoustic requirement of reference (a), then execute airborne and structure-borne noise testing per references (b) and (f). The contractor shall also test four pumps (two meeting Navy spec, two not) provided as GFP. For the option, the contractor shall execute first article inspection for EMC (per MIL-STD-461G) and electrical interface testing (per MIL-STD-1399 Section 300B) on two APD units using a Government-provided isolation valve controller and two automatic isolation valves. The contractor shall provide detailed test reports per CDRL A001 and a GFP status report per CDRL B001. Government representatives may witness testing in-person or remotely, with at least 30 days' notice required.
We post new uncategorized opportunities in Maryland as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"20817-5700""BETHESDA""MD""USA""CARDEROCK DIVISION""9500 MACARTHUR BOULEVARD""Solicitation Amendment N0016726Q11660002 SF 30.pdf"581098"file"".pdf""1""2026-09-24T18:58:32.028+00:00""5542c0274e5d4961a997385b3178857c""public""0""public""93f1e4215eb14396921ef2cd9ceb8fa0""0"25"0""Solicitation Amendment - N0016726Q11660001.pdf"1811122"file"".pdf""1""2026-09-21T15:19:23.662+00:00""5aa65d590b7647e29eb619fbff35a404""public""0""public""893973abc1f9429a8b33c9538edcec0d""0"24"0""Reference c Test Procedure for Electromagnetic Capability.pdf"338890"file"".pdf""1""2026-09-21T15:19:23.662+00:00""ea6b621594d5418e8579846ddb56c361""public""0""public""37984257a6ae4ea0b18af74cc423792f""0"23"0""Reference d Test Procedure for Electrical Interface.pdf"171597"file"".pdf""1""2026-09-21T15:19:23.662+00:00""39a9f4b35b42418ab5b24e926fcb3610""public""0""public""643f1147899446bcb28d9db2e6dc3bde""0"21"0""Reference e Isolation Valve Packing Instructions.pdf"150980"file"".pdf""1""2026-09-21T15:19:23.662+00:00""de9e92100e104c1ba44b8602caf114fc""public""0""public""8281c1c913d24f8c95b3b3c1aff8390e""0"19"0""Reference f Test Procedure for Structure born Noise.pdf"153614"file"".pdf""1""2026-09-21T15:19:23.662+00:00""850e8d01d53e453ea7ac38d9a85714cd""public""0""public""fe9cbfbe62d7430892e15258e19026e4""0"17"0""Reference b Test Procedure for Airborne Noise.pdf"196139"file"".pdf""1""2026-09-21T15:19:23.662+00:00""d2dc7683a25d4ca4a9f07e49dd7cc9c3""public""0""public""f245642d00fc4fa1ac3e57ae91ccb31e""0"15"0""Reference a Performance and Testing Specification.pdf"177180"file"".pdf""1""2026-09-21T15:19:23.662+00:00""aa093f0aa33843f9a2b81e76367d6c27""public""0""public""85514022018040b69e5aa96dd449186c""0"13"0""Gfp_Attachment_V3_ac6526.xlsx"9794626"file"".xlsx""1""2026-09-16T10:20:35.001+00:00""456da47659bb4fe09c11e48bb362e283""public""0""public""248c3902f70d48298074624d557cc9f3""0"10"0""A8b DI NDTI 80809B Test Inspect Report.pdf"319962"file"".pdf""1""2026-09-16T10:20:35.001+00:00""f6be485c19ba4c00b78242385b1aedce""public""0""public""49f879baeb5943acb8cb11ad73b2a052""0"8"0""Encl (2) CDRL A001 - Test Report.pdf"149015"file"".pdf""1""2026-09-16T10:20:35.001+00:00""5b8a7dabd7084e80a50cfa4aba01e5b7""public""0""public""6be40ae054704c00b69ad042951b7053""0"6"0""Encl (3) CDRL B001 - GFP Report.pdf"148762"file"".pdf""1""2026-09-16T10:20:35.001+00:00""a3aa25fdcb174f59b87999ce2b8f6c48""public""0""public""8e75cd3eb56848da88d7426e83014508""0"4"0""dd254 spectral labs.pdf"73952"file"".pdf""1""2026-09-16T10:20:35.001+00:00""e3576e2ee23a4845a005d39d03be77e3""public""0""public""bbeb3a96e68b460e9f0095ab8dfd2ff3""0"2"0"Most Maryland work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 9159d10417af4fbaadfa29cd3a874d00), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.