This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Quotatuions are being requested and a separate written solicitation will not be issued.
Solicitation number1240LR27Q0002 is issued as a Requst for Quotation (RFQ) for :
BASE BID – The work under this contract includes furnishing all labor, materials, equipment, tools, transportation, and incidentals necessary to remove the existing 5‑ton air‑cooled refrigerant condenser unit and associated indoor coil, and to provide and install a new 2.5‑ton air‑cooled condenser unit and compatible indoor coil at the Duchesne Bunkhouse. Work shall include, but is not limited to:
• Disconnecting, recovering, and properly disposing of all refrigerant in accordance with federal and state environmental regulations.
• Disconnecting and removing the existing condenser, indoor coil, associated piping, electrical connections, mounting hardware, and any other components required for a complete system removal.
• Providing and installing the new 2.5‑ton condenser and coil, including all refrigerant piping, line sets, insulation, fittings, mounting pads, vibration isolation, and supports as required.
• Making all necessary electrical modifications, including reconnection to existing circuits, installation of new disconnects or breakers if required, and ensuring code‑compliant grounding and bonding.
• Pressure‑testing, evacuating, and charging the new system with the appropriate refrigerant type and quantity, following manufacturer specifications.
• Verifying proper airflow, condensate drainage, thermostat compatibility, and control wiring to ensure a fully functional and balanced system.
• Performing system start‑up, testing, and commissioning to confirm proper operation and to meet manufacturer performance standards.
• Restoring and/or repairing all surfaces, penetrations, and finishes affected by the work, leaving the site in clean and workmanlike condition.
All work shall be completed in accordance with applicable codes, manufacturer instructions, and agency standards to provide a fully operational and complete HVAC system.
This acquisition is set-aside for small business concerns. The applicable North American Industry Classification Standard Code is 238220. The small business size standard is $19 Million. This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quotation which will be considered by the agency.
Furnish all labor, materials, equipment, tools, transportation and incidentals to disconnect, recover and compliantly dispose of refrigerant, remove the existing 5-ton condenser, indoor coil, piping, electrical connections and mounting hardware, provide and install a new 2.5-ton condenser and coil including refrigerant piping, line sets, insulation, fittings, pads, vibration isolation and supports, perform electrical modifications and code-compliant grounding and bonding, pressure-test, evacuate and charge the system, verify airflow, condensate drainage, thermostat compatibility and controls, perform start-up testing and commissioning, and restore surfaces and finishes affected by the work.
We post new hvac opportunities in Utah as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""US""844012310""Ogden""UT""USA""324 25th ST""C04 Attachment 5 - Team Partner Consent Form.pdf"721401"file"".pdf""1""2026-10-29T22:14:59.245+00:00""63972c66fcb145399fa4604dbff9ecc7""public""0""public""c3cdc2b2ab5f4011b77bc2274bd96681""0"8"0""C04 Attachment 3 - Wage Determination.pdf"680126"file"".pdf""1""2026-10-29T22:14:59.245+00:00""b47298f52e5041bdb64df491cd78b8e2""public""0""public""ac41badf9b114540b116fb5656aa33b4""0"8"0""C04 Attachment 6 - Biobased Product List.pdf"402234"file"".pdf""1""2026-10-29T22:14:59.245+00:00""8e8ce3bf51774f34812f7835309f708d""public""0""public""c1346c6edfb848858a2d961021279c78""0"7"0""C04 Attachment 7 - Equipment List.pdf"381317"file"".pdf""1""2026-10-29T22:14:59.245+00:00""5363c983aa874ec8a937d99bcbd84530""public""0""public""2b0656b70c6d4756888db7cb4df09c5b""0"6"0""C04 Attachment 4 - Past Performance Data Sheet.pdf"336052"file"".pdf""1""2026-10-29T22:14:59.245+00:00""5b248ddc89a74e92b4c42da17cf4673e""public""0""public""e673ffacf1b541fabeaa554def27edbc""0"5"0""C04 Attachment 1 - Solicitation Terms and Conditions.pdf"315956"file"".pdf""1""2026-10-29T22:14:59.245+00:00""278a16f06fd04a198a4deae6ad76c544""public""0""public""f53f8886717c461cb86c886d3912e9f8""0"4"0""C04 Attachment 2 - Statement of Work.pdf"222740"file"".pdf""1""2026-10-29T22:14:59.245+00:00""53c51093b82c4a36a2238e96ebce9c6b""public""0""public""c645ec0f85ec4fe79ecdfe7769eda9ee""0"3"0""C04 Attachment 8 - Schedule of Items.pdf"133394"file"".pdf""1""2026-10-29T22:14:59.245+00:00""3272b03bd85e4504ae6e2a6bee5270e3""public""0""public""8bdd0d1665e14be59f43dd61b4788980""0"2"0""C04 1240LR27Q0002.pdf"141335"file"".pdf""1""2026-10-29T22:14:59.245+00:00""8e90979924244967990fafcee9d44d88""public""0""public""d53c193bca2d4a3bb95d95c07b3d5c43""0"1"0"Most Utah work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 9158d089bdb743b48614818d02d651ad), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.