The contractor shall provide for and furnish all labor, materials, equipment, qualified supervision, and other items designated in this contract in accordance with federal, state, and local authorities, project specifications, and drawings necessary to complete the construction of this project at the VA Medical Center, Tomah, Wisconsin 676-23-009, Replace Cast Iron Fittings.
The contractor shall remove and replace existing cast iron or malleable/ductile iron fittings, valves, steam traps, steam pressure safety valves, and steam pressure reducing valves on any steam system over 15 psi or condensate systems at a temperature over 257°F. The work covers multiple buildings, crawl spaces, attics, basements, tramways, and exterior trenches and manholes, and must be performed in phases to maintain hospital operations 24/7. The contractor must also provide all labor, materials, equipment, qualified supervision, and comply with federal, state, and local authorities, project specifications, and drawings.
We post new plumbing opportunities in Wisconsin as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""53214""MILWAUKEE""WI""USA""GREAT LAKES ACQUISITION CENTER""115 S 84TH ST""36C25226B0037 0001.docx"124003"file"".docx""1""2026-08-27T12:54:40.673+00:00""a4dd1b620206465ca94d0c407944574c""public""0""public""9d7e58e2996c4207aa606888dea8c4e5""0"8"0""36C25226B0037 0001.docx"123626"file"".docx""1""2026-08-27T00:09:05.772+00:00""b02f4d1aed3047ee9dea925ffe36a26e""public""2026-08-27T12:54:40.673+00:00""1""public""4a2767b836b148d696403e588cccf27f""0"7"0""2026-08-27T12:54:40.673+00:00""S02 - Wage Det 07242026.txt"48315"file"".txt""1""2026-08-21T02:05:59.874+00:00""d254f2d516ec44828e940b0ed07f8f14""public""0""public""5df6bf432a32405eabe25a52dfdf47d8""0"6"0""S02 - 676-23-009 Replace Cast Iron Fittings - 100 Bid Specifications.pdf"2151286"file"".pdf""1""2026-08-21T02:05:59.874+00:00""4a6206324c354907bbbbd813c3023df1""public""0""public""43751354ec7b4cb396f11ab8e631ef91""0"5"0""S02 - 676-23-009 Replace Cast Iron Fittings - 100 Bid Drawings P2.pdf"12433204"file"".pdf""1""2026-08-21T02:05:59.874+00:00""34beaf27dc214d3cb8113234d6b0893c""public""0""public""de32938a36e145ec819c96024c7babb6""0"4"0""S02 - 676-23-009 Replace Cast Iron Fittings - 100 Bid Drawings P1.pdf"14553794"file"".pdf""1""2026-08-21T02:05:59.874+00:00""daef1c0a0c04496c8ebc500a921dd89f""public""0""public""b843c468f637459dacfc85f6a6329e60""0"3"0""VAAR 852.docx"16661"file"".docx""1""2026-08-21T02:05:59.874+00:00""c72b40807ac7458493b467c0b574a2f6""public""0""public""2cf54ee10fff4e8c9b1ee3a913ce2d0b""0"2"0""S02 - 36C25226B0037.docx"269906"file"".docx""1""2026-08-21T02:05:59.874+00:00""f9364617b043495489599ee7ddb56430""public""0""public""fc2addaafab44336aacac4f6204160d0""0"1"0"Most Wisconsin work asks for the two below, and the solicitation documents are where it’s stated. Here’s what each costs through Light RFP if you need one.
Source: SAM.gov (notice 90bd3c72509c40bd859971c656ca7000), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.