The United States Government (USG), U.S. Embassy Paramaribo requires Construction Administration and Monitoring services for one (1) housing project to renovate a former hotel into a Marine Security Guard Residence (MSGR). The attached Statement of Work (SOW) defines the services to be performed by the Architect / Engineer (A/E) Contractor.
The selected firm’s/individuals’ qualifications shall include:
Proficiency in English, particularly with respect to architectural and engineering technical language.
Licensed or otherwise qualified professional services including, but not limited to, either on-staff or through contractual resources: Architecture, Engineering (PE) (electrical, mechanical, plumbing, structural, civil, telecom), and Fire Protection.
Demonstrated prior experience with host country codes, standards, and practices.
Demonstrated prior experience with local project(s) of comparable scope, scale, and quality of the required tasks.
Demonstrated ability to coordinate with local and U.S. professionals engaged under separate agreements to provide other design and construction services.
The selected firm and staff will be subject to background checks, as required for visits to US diplomatic facilities.
Interested firms/individuals are invited to submit letter of interest and statement of qualifications that include:
Complete business address and telephone number of firm.
Complete names, nationality, date and place of birth, citizenship, and position/title (if appropriate) of the following:
Individuals having ownership of the firm.
Key officers of the firm.
Key staff who will work on this project.
A listing of all major projects in which the firm was involved during the past three (3) years.
Base country and base country identification number, if any.
Completed attached SF-330 Form
Statements of interests are due by Nov 6, 2026. No quotations will be accepted after this time. Statements must be in English and incomplete quotations will not be accepted.
Your statement of interest must be submitted electronically to PRMProcurement@state.gov. It is important to make sure the submission is made in specific size and format; in MS-Word 2007/2010 or MS-Excel 2007/2010 or Adobe Acrobat (pdf) file format. The file size must not exceed 30MB. If the file size should exceed 30MB, the submission must be made in separate files and attached to separate emails with less than 30MB each.
Offerors shall be registered in the SAM (System for Award Management) database at https://www.sam.gov prior to submittal of their offer/proposal as prescribed under FAR 4.1102. Failure to be registered at time of proposal submission may deem the offeror’s proposal to be considered non-responsible and no further consideration will be given. Therefore, offerors are highly encouraged to register immediately if they are interested in submitting a response to this requirement.
The Contractor shall provide professional A/E services for construction phase Quality Assurance oversight, including performing at least 52 weekly site visits over 12 months, documenting inspections with logs and photos, reviewing construction contractor invoices, reviewing and commenting on 25 submittals and shop drawings, and reviewing and commenting on 25 Requests for Information (RFIs). The Contractor shall also develop and maintain a site inspection schedule, maintain detailed records, and report significant deficiencies or safety concerns within two hours.
We post new architecture and design opportunities in Nevada as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""20520""WASHINGTON""DC""USA""DEPARTMENT OF STATE, 2201 C ST NW""Paramaribo MSGR AE Services SOW 2026_FINAL DRAFT.docx"160044"file"".docx""1""2026-10-19T16:47:42.103+00:00""d8e0615fbb5342858958399002744d5e""public""0""public""b8e71559c94e4be598b6723002882aa8""0"3"0""SF330-21b.pdf"980366"file"".pdf""1""2026-10-19T16:47:42.103+00:00""eea09d8501174feaad183b897edaed68""public""0""public""d15a3cfe55c142d1871934656d6bf663""0"2"0""Request for LOI-SOQ- Paramaribo MSGR Locally Procured On Site QA Services_FINAL DRAFT.doc"54272"file"".doc""1""2026-10-19T16:47:42.103+00:00""34cc3493340d45328695f823b0c9b502""public""0""public""ab2d02b4c4a84cb488017dc020a8586b""0"1"0"Most Nevada work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 8e52c0b49dfe4a339ee3427f45028214), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.