The Arnold Engineering Development Complex (AEDC) Tunnel 9, located in Silver Spring, MD, requires the comprehensive modernization of a high-performance hydraulic motion system. The scope of this Firm Fixed-Price (FFP) requirement includes the design, engineering, procurement, off-site fabrication, pre assembly, on-site demolition, installation, and commissioning of core system components. All components must comply with ASME B31.1, ASME BPVC VIII, and ISO 4406 standards. Core components include:
• Primary control valve (step response time of 55 ms or less)
• Main actuating cylinder (working stroke of 120.5” capable of achieving a linear speed of 13 ft/s)
• Hydraulic Power Unit (HPU)
• Dedicated filtration and cooling "kidney" loop.
The contractor will design, engineer, procure, fabricate off-site, pre-assemble, demolish the legacy system on-site, install and commission a new hydraulic system. Components include a primary control valve, a main actuating cylinder, a Hydraulic Power Unit, accumulators and piping, and a dedicated filtration and cooling kidney loop. Work is phased as engineering design, manufacturing/test/delivery, and demolition/installation/commissioning, with components complying with ASME B31.1, ASME BPVC VIII and ISO 4406.
We post new goods & materials opportunities in Maryland as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"37389-1332""ARNOLD AFB""TN""USA""CP 931 454 7841""100 KINDEL DR STE A332""Combined Solicitation- Pitch Upgrade- Amend 0001.pdf"142782"file"".pdf""1""2026-11-06T21:30:27.325+00:00""d7c765ea09504b44b5aefb20f588517c""public""0""public""46b80867685c40a0aaa8ec418d6a1c39""0"7"0""SOO for Pitch Hydraulic System Upgrade.pdf"322149"file"".pdf""1""2026-11-06T21:30:27.325+00:00""33613155fbf5487bb3aeab0879b16a2f""public""0""public""926ade31912845d8a2810a3a37b018aa""0"6"0""QA - Pitch Upgrade.pdf"111918"file"".pdf""1""2026-11-06T21:30:27.325+00:00""5dc3a33a8ba046138f9f1a86db18fea9""public""0""public""83a53faaf63b48d0928671586738f3d2""0"5"0""Solicitation Amendment - FA910127QB0030001.pdf"596655"file"".pdf""1""2026-11-06T21:30:27.325+00:00""b3b08118bc13469a9370373e7e8aa5ee""public""0""public""1df8498420a949f49b17dab3dd058767""0"4"0""SOO for Tunnel 9 Hydraulics Upgrade.pdf"317621"file"".pdf""1""2026-11-03T15:56:41.461+00:00""a7f1848d3e76478f82aa861c1166f559""public""2026-11-06T21:30:27.325+00:00""1""public""f7f482373a30427e87389fe104b137d2""0"3"0""2026-11-06T21:30:27.325+00:00""Combined Synopsis Solicitation - Pitch Upgrade.pdf"265763"file"".pdf""1""2026-11-02T19:29:36.985+00:00""50b1049ab10f48c386b71595ab2c2ff4""public""2026-11-06T21:30:27.325+00:00""1""public""e83473cdfed24b3c8186f78550ee1c65""0"2"0""2026-11-06T21:30:27.325+00:00""Solicitation - FA910127QB003.pdf"4538439"file"".pdf""1""2026-11-02T19:29:36.985+00:00""4ff379a6209b4ef4b42d073d691e769d""public""2026-11-06T21:30:27.325+00:00""1""public""bab03feee5d740d09db1a9777b4a31ed""0"1"0""2026-11-06T21:30:27.325+00:00"Most Maryland work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what an agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 8d521e6712e7429e94c48df2a6754b6a), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.