This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Quotations are being requested and a separate written solicitation will not be issued.
Solicitation number 1232SA27Q0021 is issued as a Request for Quotation (RFQ) for Cubicle Electrical Wiring and Data Wiring.
This acquisition is set-aside for small business concerns. The applicable North American Industry Classification Standard Code is 238210 The small business size standard is $19.0 million This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quotation which will be considered by the agency.
The contractor shall provide all necessary labor, supervision, materials, supplies, tools, equipment, and transportation to perform the electrical installation of a 5-station cubicle and one single hotel desk arrangement. This includes hardwiring the new cubicles into existing wall outlets, integrating power and data raceways/channels within the cubicle system, installing two duplex electrical outlets and two data ports (RJ45) per station, providing raceway/faceplates, and performing waste removal and site cleanup. The work must be performed by a licensed electrician.
We post new electrical opportunities in Wisconsin as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""US""20705""BELTSVILLE""MD""USA""5601 SUNNYSIDE AVENUE""C04b SCA WD 2015-4897_1232SA27Q0021.pdf"401823"file"".pdf""1""2026-11-20T15:15:51.58+00:00""6ae6321f245f4df79a5c78e818f9f0ca""public""0""public""c28af925866b4142b56080615d5e9cdf""0"4"0""C04 Sol_1232SA27Q0021.pdf"270306"file"".pdf""1""2026-11-20T15:15:51.58+00:00""80c64e7410144c2f9181a6c648481d4a""public""0""public""2a18b4f5bdaf48b095de351bfc1ea2b8""0"3"0""C04a SOW 1232SA27Q0021.pdf"237892"file"".pdf""1""2026-11-20T15:15:51.58+00:00""0a4523528edc48a1898cbe9da25de4fa""public""0""public""97f482ebded24cf984c4ddf9f9847f1b""0"2"0""C05 Sol_1232SA27Q0021_Amd_0001.pdf"302170"file"".pdf""1""2026-11-20T15:15:51.58+00:00""10f558cfa30d4dbf972b53f09b513937""public""0""public""9f840e9c7c114ae5a1cbe05f17a1c005""0"1"0"Most Wisconsin work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 8c35373e3e5c4e3bb88b3fb51c3ea2c1), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.