Heater Exchange Repair (Correction and Rebuild of Shell and Tube Heat Exchangers: One time Service) for RMR. Department of Veterans Affairs Eastern Colorado Health Care System, Located at 1700 N. Wheeling Street. Aurora, CO 80045. Due 11/10/2026 at 14:00pm MST.
The contractor shall furnish all labor, materials, supplies, tools, equipment, and qualified personnel to: (1) provide and install two new flanged hot water valves at designated line locations; (2) provide all required installation materials including gaskets, bolting, supports, and associated hardware; (3) confirm proper valve orientation, accessibility, and operability after installation; (4) perform leak testing or pressure testing of each affected piping section; (5) remove channel heads, bonnets, and associated covers to access the tube side; (6) inspect tube interiors for fouling, scale, sludge, debris, and visible signs of corrosion or damage; (7) clean tubes using high-pressure water cleaning or mechanical brushing/rodding; (8) remove and dispose of waste, debris, and cleaning residues; (9) visually inspect tubes after cleaning; (10) reassemble exchanger components with new gaskets and seals; and (11) perform pressure testing or leak testing prior to return to service. The work also includes adding isolation valves to six currently failing heat exchangers, including one flanged 150# 8" gate valve on 3-SWHX-2 steam line, two flanged 150# 6" hot water valves on 4-SWHX-3 and 4-SWHX-4, and one 6" butterfly valve on the hot water line between 03-HWHX-3 and 03-HWHX-4. System drain and fill, insulation removal and reinstallation, non-destructive examination, and electrical or controls modifications are excluded from the scope.
We post new goods & materials opportunities in Colorado as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""80111""Greenwood Village""CO""USA""6162 S WILLOW DR""SUITE 300""Wage Determination 2015-5419.pdf"69904"file"".pdf""1""2026-10-30T14:27:57.492+00:00""b48009568a8e48ad865509c3b29e4d55""public""0""public""0b24656d986c432abfc847bd611428e5""0"3"0""PWS Rebuild of Heat Exchangers.docx"24569"file"".docx""1""2026-10-30T14:27:57.492+00:00""400b6d18fc864a729341670f7515f98b""public""0""public""754876830ab34e0296067e520348500f""0"2"0""36C25927Q0038.docx"52028"file"".docx""1""2026-10-30T14:27:57.492+00:00""32ba4da311594a019c590f8b0698d0a5""public""0""public""4287bc8960994e5eb03f70a09aa382ae""0"1"0"Most Colorado work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what an agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 8bddbc48585248068e69d792dbdb39d9), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.