We'll email you new equipment maintenance & rental opportunities in Florida as agencies publish them — free, unsubscribe whenever.
And get prequalified now, so the bond is never the scramble on the next one. Prequalify for bonding →
The govvernment has a requirement for preventative shredder maintenance. This will be a base year plus 4 option years. The contractor shall provide all management, labor, tools, equipment, transportation, materials and incidentals necessary to provide four
preventative maintenance service visits on two Model 1424 SEM Disintegrators and one Model 22 SEM Disintegrator.
Maintenance IAW with the Statement of Work.
Questions for this requirement are due by 23 November 2026 @ 10:00 AM EST.
Quotes for this requirement are due by 30 November 2026 @ 10:00 AM EST.
The contractor shall perform quarterly preventative maintenance on two Model 1424 SEM Disintegrator Systems and one Model 22 SEM Disintegrator System, including inspecting rotor bearings, hopper, cutting chamber, security screen, bolts; removing dull knives and installing spare sharp sets; adjusting rotor and bed knife tolerances; inspecting drive sheave bolt tension, drive belts, conveyor and controls; greasing bearings; inspecting and cleaning the evacuation system, FT40 filter, fan cyclone, rotary airlock; inspecting safety switches and motor starters; and cleaning the work area. Emergency maintenance (48-hour response) and urgent maintenance (72-hour response) are also required on an as-needed basis. The contractor must submit a maintenance report after each visit and obtain project acceptance from the Facilities POC.
"33621-5119""TAMPA""FL""USA""AF NO MILSBILLS CP 8138284766""2610 PINK FLAMINGO AVE""Solicitation - FA481427Q0001.pdf"721795"file"".pdf""1""2026-11-17T17:54:54.608+00:00""8e5e38dfb7d6408fb515bb474cf70422""public""0""public""9065a4f9f6364ec7941475d188f90d1b""0"4"0""Attch 2 CLIN Structure Shredder Maintenance.pdf"303737"file"".pdf""1""2026-11-17T17:54:54.608+00:00""b49291ed4fc749209b541901a0461162""public""0""public""bdcbedc3262840e0bfc0f9127941d618""0"3"0""Attch 1 SOW Shredder Maintenance.pdf"430059"file"".pdf""1""2026-11-17T17:54:54.608+00:00""4cfb3ee19039428d9eeb4b5d647ca921""public""0""public""777c550b5c534b6c9a75ccd57e80c519""0"2"0"Most Florida work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what an agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 88a9740a61fe43fa94d4653253675fd4), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.