Amendment 02, dated November 2, 2026 - This Amendment extends the due date one week to 5:00 PM CT, Friday, November 13, 2026. This Amendment also adds the file "RFP 388000kmb Amendment 02" to the list of attachments, providing clarifications and answers to submitted questions. No other Terms have changed.
Amendment 01, dated October 23, 2026 - This Amendment adds the file "RFP 388000kmb Amendment 01" to the list of attachments. This Amendment provides clarification to the technical specifications. No other Terms have changed.
Fermilab is seeking to procure bar grating and saddle clips. Please see attached Fermilab RFP 388000kmb and associated documentation. Please review the RFP document fully, as it outlines how to submit a complete proposal package.
Proposal Due Date: 5:00 PM CT, Friday, November 6, 2026 (see Amendment 02 for new due date)
Submitting a complete proposal package includes:
Proposal with lead time
RFP 388000kmb
SARC - Subcontractor Annual Reps & Certs (PROC-FRM-100 v1.0) – If not completed within the last year
PROC-FRM-466 - Proposal Certifications (v1.0)
The subcontractor shall provide all bar grating and associated clips/hardware meeting the specification: bearing bar height 1-1/2", bearing bar thickness 3/16", nominal unsupported span 48", bearing bars parallel to span direction with maximum clear spacing of 1", dead load (self-weight) 11 PSF, live load 100 PSF minimum, concentrated line load at mid-span 1000 LB minimum, nominal maximum deflection 0.25", maximum panel width 2'-0", galvanized (hot dipped) material, and clips clamping to the top flange of W44x290 cryostat roof beams and/or W10x49 spacer beams. The RFP line items total 530 grating panels in eight sizes (e.g., 368 at 62.875" x 24" x 1-1/2", 72 at 62.875" x 12", 60 at 76.75" x 24", 20 at 78.75" x 24", 4 at 78.75" x 12", 2 at 62.875" x 25.875", 2 at 76.75" x 13.875", 2 at 76.75" x 12") plus 1,768 Type W44 saddle clips and 352 Type W10 saddle clips. Post-award deliverables include bar grating sized per the FFDG drawing, customer support for installation/operation questions, operator's manuals, and a logistics and shipping plan; a mill certification and CoC are required with delivery.
We post new goods & materials opportunities in South Dakota as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"Richland""WA""US""2345 Stevens Drive""60510""Batavia""IL""USA""Kirk Rd. & Pine St.""RFP 388000kmb Amendment 02.pdf"274303"file"".pdf""1""2026-11-02T16:33:40.174+00:00""2740a76dc32f486cb0987634acedf583""public""0""public""bf5452a93dc940858d50ccc834b45920""0"28"0""RFP 388000kmb Amendment 01.pdf"264319"file"".pdf""1""2026-10-23T16:42:25.605+00:00""98b6482f51e44358b1671b973f19ddd1""public""0""public""c47f708622a043368dbe666487eea0e2""0"27"0""RFP 388000kmb.pdf"476553"file"".pdf""1""2026-10-21T19:14:53.417+00:00""4c99176a0e4e42798b688509428944cd""public""0""public""8e114de1cf6144a9b9022d24dfdc5fa4""0"26"0""VD_Roof_Decking_-_Bar_grate_SOW-260916.pdf"1287705"file"".pdf""1""2026-10-21T19:14:53.417+00:00""e3cb6da91fb547919ddc7a73ac122e3e""public""0""public""962cb965057b41ed9e0ce1625ecc11d5""0"25"0""FDC-0001043.pdf"149203"file"".pdf""1""2026-10-21T19:14:53.417+00:00""32ba594426cc40ae9102da6d1b058b8c""public""0""public""10c37bed2eb74884837f50b0a0d3ed50""0"23"0""Ross_Load_Envelopes_v5.pdf"629222"file"".pdf""1""2026-10-21T19:14:53.417+00:00""4a0cb071a1d6409a80b411e06a0bef59""public""0""public""c22f6118f18b4323a07f1af51be82c23""0"20"0""Shipping_Expectation_Fact_Sheet.pdf"285530"file"".pdf""1""2026-10-21T19:14:53.417+00:00""a9e7468f7c374ecfbe01c2f9a0d4eed2""public""0""public""de96709a217f432b83aa57a6aa963c8b""0"17"0""Subcontractor Annual Representations and Certifications (SARC).pdf"482741"file"".pdf""1""2026-10-21T19:14:53.417+00:00""c264352a09e947d493522048e252b04e""public""0""public""818518551b934bc79ac5d3057fabfbb2""0"14"0""PROC-FRM-466 - Proposal Certifications.pdf"415824"file"".pdf""1""2026-10-21T19:14:53.417+00:00""9229109134c747208ee8c612788e86da""public""0""public""eb770fc511784a48b3864a9222fd77c7""0"11"0""PROC-EXH-469 - Compliance With Federal Anti-Discrimination Laws.pdf"256853"file"".pdf""1""2026-10-21T19:14:53.417+00:00""9e0bc775e44c4da2a7bfff2a8009f003""public""0""public""8033cbae78524a8f9081e4cc22254054""0"8"0""FFDG General Terms and Conditions for Commercial Products and Commercial Services (08.2025).pdf"396174"file"".pdf""1""2026-10-21T19:14:53.417+00:00""67cf0deb14d047b28bc48935cd2a2e66""public""0""public""09df46eb311d41bab7638ab0e49eae86""0"5"0"Most South Dakota work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what an agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 88567b8af2e7413397b03df100f612c2), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.