This is an official Request for Proposal (RFP) for the EIN Injector Complex A/E Design project at Brookhaven National Labs. Refer to the RFP Letter and attachments for details and proposal submission requirements.
Amendment 1 is posted to update the RFP letter amendment 1 for highlighted changes, specifically as it relates to the questions due date. The signed SOW is also included to the list of attachments.
Amendment 2 is posted to incorporate Addendum 1 to the Statement of Work and post responses to the questions submitted in response to this RFP. See attachments section for Addendum 1 and the Q&A responses.
The A/E will develop preliminary design (Title I) including 30% design drawings and outline specifications for civil, architectural, structural, mechanical, and electrical disciplines; prepare Preliminary Design Report with cost and schedule baselines, geotechnical investigation, topographic surveys, soils investigation, technical specifications in CSI format, electrical arc flash compliance report, and hydraulic modeling of cooling water systems using Fathom software. The A/E will then develop final detailed design (Title II) incorporating refined hydraulic models, final cost and schedule updates, and complete construction documents. Optional Construction Support Services (Title III) may include up to 24 specified site visits for review, clarifications, and construction oversight, with pricing for additional visits, RFIs, and extended support determined separately.
We post new architecture and design opportunities in New York as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"Richland""WA""US""2345 Stevens Drive""11973""Upton""NY""USA""P.O. Box 5000""RFP Amendment 2.zip"662024"file"".zip""1""2026-11-20T16:18:42.739+00:00""145fc37b8c3d4c50a1128836b5a8039c""public""0""public""96684b3223d0453e94265c64f4009710""0"18"0""Basis of Design - EIN_Injector.pdf"153542075"file"".pdf""1""2026-11-03T15:39:21.344+00:00""44688f22adc9414ca6d01856a808cee8""public""0""public""a776759c9c894b86a0fdad64e2d6a235""0"17"0""RFP Amendment 1.zip"1879553"file"".zip""1""2026-10-29T14:58:16.06+00:00""f7a605d7fb2249cf991ead8813d28499""public""0""public""d79bee9482c94ba9a1c1d57271da81e6""0"16"0""RFP Letter - Attachments - Enclosures.zip"3634953"file"".zip""1""2026-10-24T01:02:43.581+00:00""4a0fd01ad2a54a66957fac4624cbb324""public""0""public""6a934117a81a49309e75aedb52ed7bb6""0"15"0""NEPA - BHSO Letter June 2025.pdf"219713"file"".pdf""1""2026-10-24T01:02:43.581+00:00""066b1b6f54744ab08ebfc9953b4abfe8""public""0""public""6ed2accf9cd54ba5ba83926c49f1aeb8""0"14"0""EIC Drawings Vol. I.zip"190868715"file"".zip""1""2026-10-24T01:02:43.581+00:00""19a1406bc69443efa48188e659aa3b92""public""0""public""d9fca9b733264a888e5b0ab0c8283a56""0"13"0""EIC Infrastructure Drawings_Volume III.pdf"70981730"file"".pdf""1""2026-10-24T01:02:43.581+00:00""3fbea18000d14b9fb501568a6f061141""public""0""public""ce8fdc00e9804743ad7a50d8fcb05ba6""0"12"0""EIN_Concept Design.pdf"115619002"file"".pdf""1""2026-10-24T01:02:43.581+00:00""e3bd3b0cd114467db1e01c63221ad78d""public""0""public""f6d2dd005b794ae59d1cf157106ddc57""0"11"0""EIC Infrastructure Drawings_Volume II.pdf"91404612"file"".pdf""1""2026-10-24T01:02:43.581+00:00""f6a92a971daa4e6eabf1205a6bbdd791""public""0""public""81472d3c9648443faf0a87f83d988e46""0"10"0""EIC Infrastructure Drawings_Volume IV.pdf"67901155"file"".pdf""1""2026-10-24T01:02:43.581+00:00""490ec45dc4de48f9b0a4d8e91b0f7c13""public""0""public""81922b9e79b6417fb64670a166894209""0"9"0""EIC-ESH-PLN-008 EIC Hazard Analysis Report 2025.pdf"1008833"file"".pdf""1""2026-10-24T01:02:43.581+00:00""10abddfcbb934abc90f13c8c4c15689c""public""0""public""0cd33a2f4c0f44e48cd9cb626377c2d4""0"7"0""EIC-QAG-PLN-002 Quality Assurance Plan for EIC.pdf"648349"file"".pdf""1""2026-10-24T01:02:43.581+00:00""db3d3e4fa4e247359f8e6329f56a4de3""public""0""public""81d5116124f7409dae7ad8987e49d306""0"6"0""EIC-ORG-RSI-026 Rev 2 EIC Code of Record 2025.pdf"404584"file"".pdf""1""2026-10-24T01:02:43.581+00:00""8b3bf408ef014e3182289b37fbc10607""public""0""public""6507b5167b81487eadb3ad23d8bf1895""0"5"0""EIC Infrastructure HDR Basis of Design.pdf"10776123"file"".pdf""1""2026-10-24T01:02:43.581+00:00""0401360d65b84957a73e9ee4bae2f205""public""0""public""84b78457ffec4784be4009b657b13562""0"4"0""NEPA-DOE BHS EA for EIC.pdf"5384887"file"".pdf""1""2026-10-24T01:02:43.581+00:00""9604bd8c86c44b31b5238af43c6e71b2""public""0""public""e21e6cb2eb24462b9431baa23e5e997c""0"3"0""EIC Fire Hazard Analysis - Prelim FP Assessment.pdf"4081444"file"".pdf""1""2026-10-24T01:02:43.581+00:00""3050044a6207494db7e98cdb6fa1ca87""public""0""public""b6c5a61a22374a4c82c4fb2c6dc79ef2""0"2"0""Finding of No Significant Impact (FONSI).pdf"125725"file"".pdf""1""2026-10-24T01:02:43.581+00:00""8bf022e6bb2d457e9e5c1824f61a3a89""public""0""public""9fe79970477d4f8a83195f161ce30780""0"1"0"Most New York work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 884620f0b21d4e6887235b2a474d261b), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.