Amendment 0001 is issued to attach the Pre-Proposal Site Visit Sign-In sheet.
Work includes raising, realigning, and cleaning all headstones and markers; replacement of damaged or missing grave markers; cleaning and conservation of monuments and historic features; rehabilitation of entry gates, iron fencing, and perimeter brick walls including repointing and structural repairs; stormwater management improvements including installation of approximately 718 linear feet of new concrete pipe with catch basins and manholes, removal and replacement of existing catch basins, installation of backflow prevention devices, removal and replacement of exposed aggregate concrete pavement and historic brick curbing along Military Cemetery Road, and installation of approximately 131 linear feet of new stormwater drain line extending to a riprap-lined outfall ditch in the 'North Woods' area; restoration of historic plantings, tree canopy, turf, and cultural landscape features; rehabilitation of entrance walkway and walkways at Superintendent's Lodge; and improvements to visitor access and experience including seating, interpretive elements, circulation, and parking. Work will be conducted in phases with each headstone section finished before beginning the next. Contractor must catalog, geotag, remove, clean, wrap, store, and reset all grave markers, headstones, and site markers affected by stormwater construction. All work shall comply with preservation standards per Section 36 CFR Part 800 and programmatic agreement conditions.
We post new exterior maintenance opportunities in Colorado as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"Sol_140PP027R0004_Amd_0001.pdf"3214179"file"".pdf""1""2026-11-06T17:47:10.103+00:00""542133a9c8aa4f859c7d2fd079dee447""public""0""public""4cad74df39a9427dae5a7d3180c74a3f""0"8"0""Sol_140PP027R0004.pdf"807550"file"".pdf""1""2026-10-23T17:05:11.088+00:00""4ea3a2980a104582bb62728943806982""public""0""public""7cf1205636844b0fa53cf0910bb9b920""0"7"0""B08_Attachment_1_-_Specifications.pdf"34453059"file"".pdf""1""2026-10-23T17:05:11.088+00:00""25a99b4eb2dc4551b2730b0e597f7b67""public""0""public""0604f79db38f45749f1db7181d9b8397""0"6"0""B08_Attachment_2_-_Drawings.pdf"81572869"file"".pdf""1""2026-10-23T17:05:11.088+00:00""d7b9ea38494044c1991f145421fec0f4""public""0""public""548804ed3c9f4e729b8bc391cc15c813""0"5"0""B08_Attachment_3_-_DOL_Wage_Determination_LA20260005.pdf"61603"file"".pdf""1""2026-10-23T17:05:11.088+00:00""03f2eaba6bae4d3a866e980e8e47e451""public""0""public""ee292a452687444086dd47f3230bef19""0"4"0""B08_Attachment_4_-_Supplemental_Reports.pdf"13554510"file"".pdf""1""2026-10-23T17:05:11.088+00:00""5a0ec8fefed4429d9226c7dc3eecd425""public""0""public""a6507ae59d9e43a0a1badbc77e67b8e3""0"3"0""B08_Attachment_5_-_Permit_Documentation.pdf"25903754"file"".pdf""1""2026-10-23T17:05:11.088+00:00""9e56a7847cc345df82055e6f307312ed""public""0""public""6fa2a18b4dbd469aa80e469f31d3fe97""0"2"0""B08_Attachment_6_-_Proposal_Submission_Package.pdf"815998"file"".pdf""1""2026-10-23T17:05:11.088+00:00""1d5d9898bdbe4f55850735277668eef8""public""0""public""6bef022003ce453087a33ed7b837e7b0""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 86bcb7d4101d4ab48daa38e120ac89a0), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.