This amendment (001) is to provide the sign in sheet from the site visit held 12 November 2026, as well as provide additional information reference outage plan, hazmat and circuit survey.
The contractor shall completely prepare the site for building operations, including demolition and removal of existing structures, and furnish labor and materials to perform work for Correct Electrical Deficiencies at the Fayetteville VA Medical Center as required by drawings and specifications. Work includes general construction, alterations, grading, drainage, branch circuit improvements, distribution improvements, replacement of breakers, small electrical cleanup, circuit tracing, labeling updates, necessary removal of existing structures and construction, and certain other items. Project Buildings include 1, 3, 35 and the construction of a new Medium Voltage Switchgear Building. The work also involves replacing equipment with new code-compliant equipment, including panelboards, distribution panels, switchboards, disconnect switches, automatic transfer switches, and transformers, and performing electrical distribution outages in accordance with a detailed outage plan.
We post new electrical opportunities in North Carolina as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""23667""HAMPTON""VA""USA""100 EMANCIPATION DR""21-21 Nov 2014 VACO ECA E24.pdf"4357088"file"".pdf""1""2026-11-20T01:46:58.09+00:00""d238f1c2560b4e4dbd684c845928ac7d""public""0""public""10290637c51348248963d89c39334801""0"8"0""18-Hazmat Survey.pdf"4919580"file"".pdf""1""2026-11-20T01:46:58.09+00:00""d068bd5f90c04a8a990540fa9cfd62ae""public""0""public""72b8b2e19aae4aaab9717ec2d5704421""0"7"0""19-Outage Plan.pdf"236798"file"".pdf""1""2026-11-20T01:46:58.09+00:00""b848945ab6194678aede92163661b877""public""0""public""fedcf640a29b4617ba4643d9458eb560""0"6"0""Sign-in sheet_12Nov2026.pdf"718462"file"".pdf""1""2026-11-20T01:46:58.09+00:00""8ff54057e139402585d40ec514aa1bee""public""0""public""dc8da8567f1341a685dd448c340e6402""0"5"0""565-22-500 Combined Set 20251118.pdf"43575149"file"".pdf""1""2026-11-05T13:39:42.298+00:00""5f10e13588614e73b8d6093cc7ecfab1""public""0""public""7a9ad35052284e8fa94d45a6bba22bfa""0"4"0""36C24627B0001.docx"277133"file"".docx""1""2026-11-05T00:14:33.917+00:00""fce44ccd7d284764aaab7b95b2f6f0be""public""0""public""5186a6379513459597f8b013ddf5f8d3""0"3"0""Correct Electrical Deficiencies Specifications.pdf"3378030"file"".pdf""1""2026-11-05T00:14:33.917+00:00""dfdec00c876c4ccdae3c51b3e1f7129f""public""0""public""5e82edb44b794aefb9437fd99eb67409""0"2"0""ATTACHMENT - BAA TAA COMPLIANCE CERTIFICATION.docx"21409"file"".docx""1""2026-11-05T00:14:33.917+00:00""29e6d67e83804f3882e43b6615220efd""public""0""public""b0c41c47eb964f2e83db8379d83e69ae""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 85f2f5bda6d04610834f65fad3493f4b), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.