This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Quotations are being requested and a separate written solicitation will not be issued.
Solicitation number 1240LT27Q0015 is issued as a Request for Quotation (RFQ) for GAOA BRF Roofing Project for the Bitterroot National Forest.
The work includes:
Removal and disposal of existing roofing system and associated fasteners, underlayment, applicable trim, flashing, and drip edge.
Inspection of roof decking and identification of damaged decking
Installation of underlayment, moisture barriers, flashing, and trim components.
Installation of new roofing meeting performance criteria outlines in this SOW,
Installation of replacement ridge caps, closures, and sealants,
Ensuring proper weatherproofing around penetrations, vents, and mechanical equipment
Final cleanup and disposal of all construction debris.
The roofing systems to be replaced are as follows:
Stevensville Garage Shop: Asphalt Shingles (existing 3-Tab shingles, new architectural shingles)
WF Bunkhouse: Metal Roofing (existing “delta rib”, new standing seam), includes cupola
WF Laundry Facility: Metal Roofing (existing “delta rib”, new standing seam)
Optional Item – Darby Visitor Center: Cedar shingles (Historic Building)
This acquisition is set-aside for small business concerns. The applicable North American Industry Classification Standard Code is 238160 Roofing Contractors. The small business size standard is $19 million. This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quotation which will be considered by the agency.
The contractor removes and disposes of existing roofing systems, fasteners, underlayment, trim, flashing and drip edge, inspects roof decking and identifies damaged decking, installs underlayment, moisture barriers, flashing and trim, installs new architectural asphalt shingles at the Stevensville Garage Shop, new standing-seam metal roofing at the West Fork Bunkhouse including cupola and at the West Fork Laundry Facility, and optionally new cedar shingles at the Darby Visitor Center historic building, installs ridge caps, closures and sealants, weatherproofs penetrations, vents and mechanical equipment, and performs final cleanup and disposal of construction debris within 45 days after notice to proceed at the Stevensville, West Fork and Darby Ranger Stations.
We post new roofing opportunities in Montana as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""US""59840""HAMILTON""MT""USA""BITTERROOT NATIONAL FOREST""1801 NORTH FIRST STREET""C04 1240LT27Q0015 1442 Dates with Clauses and Provisions 13 Oct 26.pdf"435482"file"".pdf""1""2026-11-18T20:02:50.598+00:00""d52eac4d42bc45ff9dcf1d45cc316d03""public""0""public""55d88dd5a39446c6acac38b4aa0c6005""0"25"0""C04 Attachment 1 FS-Schedule of Items BRF FY26 Roofing Projects 20260629.xlsx"23370"file"".xlsx""1""2026-11-18T20:02:50.598+00:00""a8f94d605d5240ee92658ed5c62d934f""public""0""public""c0334e3a6d48457eb952b998080f3a5c""0"24"0""C04 Attachment 2 Statement of Work BRF FY26 Roofing Project 20260628 corrections.docx"53890"file"".docx""1""2026-11-18T20:02:50.598+00:00""6a5e39876e634c6fb9fb639f5000c99e""public""0""public""e17263dfe77e487691b230e7c8518fe8""0"23"0""C04 Attachment 3 Project Manual for BRF FY26 Roofing Projects.docx"127375"file"".docx""1""2026-11-18T20:02:50.598+00:00""c6ef59b6bd6945a3b680453b414f7113""public""0""public""4454afb25ac54233ac9e9d40849f8e87""0"18"0""C04 Attachment 4 Stevi Garage Shop Drawings.pdf"12045264"file"".pdf""1""2026-11-18T20:02:50.598+00:00""d04249b0258945a9b7da88df3789053f""public""0""public""a668c50a166d4fc28d695222225074ea""0"15"0""C04 Attachment 5 West Fork Crew Quarters Blueprints.pdf"2632824"file"".pdf""1""2026-11-18T20:02:50.598+00:00""cd589057f3a048b3932acd8dde860639""public""0""public""8e1ff962515140c59318d1c1d6c53643""0"10"0""C04 Attachment 6 General Decision Number MT20260060 05-18-2026 Ravalli MT.pdf"2089395"file"".pdf""1""2026-11-18T20:02:50.598+00:00""d7c73866cc9849e9b6264016722885b2""public""0""public""5c4b2c63caf241e593cebf7b64940878""0"5"0"Most Montana work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.