This is an amendment to a previously synopsized requirement for the National Park Service, Point Reyes National Seashore, to rehabilitate the Limantour Residence 160.
The purpose of this Amendment no. 01 is to provide all interested parties with the site visit notes and initial round of Q&A from the site visit that occurred on 8/18/26, as well as to provide a revision to the solicitation Terms Clauses Provisions.
REVISED ATTACHMENT 1: The Terms Clauses Provisions attachment has been revised. Changes were to Sections J, L, and M. Section J was changed to update the list of attachments. Section L was changed to remove the CA Contractor License from being part of the Business Proposal submission requirements, moved to being part of the Technical Proposal submission requirements. Section M was changed to add the requirement for the CA Contractor License as an evaluation factor. Revised attachment is titled as "Amendment 1 Attachment 1 Revised Terms Clauses Provisions" dated 8/20/26.
NEW ATTACHMENT 11: The site visit #1 notes and Q&A are provided as new Attachment no. 11 dated 8/20/26, titled as "Attachment 11 Site Visit 1 Notes and Q and A." NOTE: Site Visit #2 is scheduled for August 31, 2026 at 1pm PDT at Point Reyes National Seashore as detailed in Section L of Attachment 1.
Solicitation response date has not changed. Proposals are due by 4pm PDT on Monday, September 14, 2026, emailed to Phaedra_Fuller@ios.doi.gov.
The Government reserves the right to cancel this solicitation.
The work includes installing a wall-mounted steel pier foundation system and a slab jack steel pier foundation system, demolishing and rebuilding a wood deck, railing, and stair system, removing and replacing a driveway retaining wall, installing a new security screen front door, removing and replacing lower-level flooring, and performing pest exclusion. Optional work includes painting exterior siding and trim, removing and replacing upper-level flooring, installing new exterior vinyl windows, sealing and staining new deck and retaining wall, bathroom rehabilitation, kitchen rehabilitation, and painting interior walls and ceilings.
We post new general contractors opportunities in California as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""94956""POINT REYES STATION""CA""USA""ONE BEAR VALLEY RD""Sol_140P8426R0003_Amd_0001.pdf"212160"file"".pdf""1""2026-08-20T20:24:21.552+00:00""d3f62cdf7d6745b39403c189515b4e09""public""0""public""2aaa2cadf6ae481aa13c197df5589370""0"15"0""Amendment_1_Attachment_1_Revised_Terms_Clauses_Provisions_0001.pdf"744506"file"".pdf""1""2026-08-20T20:24:21.552+00:00""a4f07e263e37485daac03fe457c68571""public""0""public""962ec18a4e5e488c86a5ab414fcbbf6b""0"14"0""Attachment_11_Site_Visit_1_Notes_and_Q_and_A_0001.pdf"138944"file"".pdf""1""2026-08-20T20:24:21.552+00:00""8dc8e4b8ea8445fb8779f425dc5004dd""public""0""public""24fbc2c4f1ba46f2a877f9c53ca7acd7""0"13"0""Sol_140P8426R0003.pdf"288750"file"".pdf""1""2026-08-19T01:36:35.673+00:00""029e735d71a4472cbdfbae9ad257072f""public""0""public""62f63a1650484744bfec031c4a9ba1e4""0"12"0""Attachment_9_Limitations_of_Subcontracting_Worksheet.xlsx"91417"file"".xlsx""1""2026-08-19T01:36:35.673+00:00""c189784fe0cf4395a2798f034ce6366b""public""0""public""6161634d05e84b14bbb95570b0ff4a85""0"11"0""Attachment_1_Terms_Clauses_Provisions.pdf"568575"file"".pdf""1""2026-08-19T01:36:35.673+00:00""33c2e0c91e3747aba508e0969f1b5091""public""0""public""5c97ac6232b74b73ae90700e57d42826""0"10"0""Attachment_10_SF24_Bid_Bond_Form.pdf"720305"file"".pdf""1""2026-08-19T01:36:35.673+00:00""40f62cc67c834a81b99264467002d08d""public""0""public""fee43cdf7d9d431892ee1ac313f2986c""0"9"0""Attachment_5_Forms_and_Provisions_to_Return_with_Proposal.docx"44531"file"".docx""1""2026-08-19T01:36:35.673+00:00""844e9007a57344e19699cf22585a3c6f""public""0""public""089e220c919e4e028e60603becc39714""0"8"0""Attachment_8_General_References_Form.docx"28806"file"".docx""1""2026-08-19T01:36:35.673+00:00""5f5dbfe64c5846c387e2d577b4150198""public""0""public""d040af0a47dd47e992f2e4fd5f64249e""0"7"0""Attachment_4A_Drawings.pdf"4198325"file"".pdf""1""2026-08-19T01:36:35.673+00:00""93fa269ee3a047218d28ca941a3e446f""public""0""public""171f15cb434144f5a80b100fc5f8c6a0""0"6"0""Attachment_4B_1993_Architectural_Plans.pdf"1541115"file"".pdf""1""2026-08-19T01:36:35.673+00:00""11e4d2e958b44f7c969877a94d1be238""public""0""public""d041e55e3e28482798cee2050e4f8270""0"5"0""Attachment_3_Specifications.pdf"9878247"file"".pdf""1""2026-08-19T01:36:35.673+00:00""1f0c7cd863474a61a1ffbc3d3127547f""public""0""public""2a43757b2e5b46cab3e6b119213407cb""0"4"0""Attachment_6_Project_Experience_Questionnaire.docx"41096"file"".docx""1""2026-08-19T01:36:35.673+00:00""0ff14bec30e64d509ec52c3e152fa299""public""0""public""f1b7ab96d1ac4c17ad4cb313e9674d8c""0"3"0""Attachment_7_Past_Performance_Questionnaire.docx"47469"file"".docx""1""2026-08-19T01:36:35.673+00:00""58ae343e4ec54c3ea0b591d49850f3d2""public""0""public""6488b21480be43178cd2f8b6d559103c""0"2"0""Attachment_2_DOL_Wage_Decision_CA20260007_Marin_County.pdf"2019072"file"".pdf""1""2026-08-19T01:36:35.673+00:00""3dd949413c7a42a7b53358d56b9dfe30""public""0""public""ce8565f743e14b34857b50614a8be036""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
Source: SAM.gov (notice 850b48b1b3b448ca8470f1ddc56e6c10), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.