Coos Bay Pier Utilities Upgrade
The U.S. Army Corps of Engineers Portland District intends to issue a firm-fixed price (FFP), Invitation for Bids (IFB) No. W9127N27BA004 to meet the requirements of Coos Bay Pier Utilities. This construction project includes mandatory work at Coos Bay, OR.
The work includes the removal, replacement, and testing of existing utilities on shore and along the pier. The work includes approximately 300 feet of potable water piping, related fittings, valves, drain plugs, elbows, pipe supports, a backflow preventer, etc., from exposed piping on shore and along the length of the pier. Replacement of two lines of approximately 300 feet of electrical conduit, cabling (wire), switches, junction boxes, receptacles, circuit breakers, transformers, etc, along the length of the pier for 120V, 240V, and 480V service. Replacement of a 600V, 225A circuit breaker on shore with a 600V/400A circuit breaker as well as associated cabling and testing. Remove and replace three light posts and reconnect. Remove 2x4, 4x4, & 6x6 wooden railing along the pier and replace with plastic lumber. Remove and replace existing life ring attached to piping and remove and replace wooden steps to access a floating dock.
The anticipated period of performance for work is 01 January 2027 – 30 April 2027.
The final solicitation will be available for download on or about 28 October 2026 with bids due 30 days after advertisement.
This procurement is anticipated to be solicited as a small business set-aside. The NAICS code for this procurement is 237990, Other Heavy and Civil Engineering Construction. The small business size standard is $45 million. The magnitude of construction is between $500,000 and $1,000,000.
An optional pre-bid site visit will occur following the advertisement of this requirement. The details of the pre-bid site visit will be in the solicitation posting.
This notice is not an invitation for bids and any bids received as a result of this pre-solicitation notice will not be accepted or evaluated. The government reserves the right to cancel this solicitation either before or after the closing date. No reimbursement will be made for any costs associated with providing information in response to this pre-solicitation notice or any follow-up information request.
The work includes removal, replacement, and testing of existing utilities on shore and along the pier. It includes approximately 300 feet of potable water piping, related fittings, valves, drain plugs, elbows, pipe supports, a backflow preventer, etc., from exposed piping on shore and along the length of the pier. Replacement of two lines of approximately 300 feet of electrical conduit, cabling (wire), switches, junction boxes, receptacles, circuit breakers, transformers, etc, along the length of the pier for 120V, 240V, and 480V service. Replacement of a 600V, 225A circuit breaker on shore with a 600V/400A circuit breaker as well as associated cabling and testing. Remove and replace three light posts and reconnect. Remove 2x4, 4x4, & 6x6 wooden railing along the pier and replace with plastic lumber. Remove and replace existing life ring attached to piping and remove and replace wooden steps to access a floating dock.
We post new electrical opportunities in Oregon as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"97204-3495""PORTLAND""OR""USA""KO CONTRACTING DIVISION""333 SW FIRST AVE"Most Oregon work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 84912f6386cf472e9b53a455f9305fbd), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.