Description:
Â
The Richard L. Roudebush VA Medical Center (RLR VAMC) has developed this project for the purpose of replacing and expanding the electrical distribution infrastructure serving the A-Wing of Building 1 (the main hospital tower). Generally, the work shall be required to include, but not be limited to the replacement and expansion of the secondary electrical distribution system serving A-Wing of Building 1 and the expansion and modification of the existing primary Medical Center campus electrical distribution system as required to support those improvements including work associated within Building 01 (A-Wing), Building 23, and adjacent exterior/campus utility areas as indicated in the contract drawings and specifications.
Â
Definitization of Equitable Adjustments:
Â
When/if change orders are issued under the resulting contract, they will be issued under the following authority(s):
FAR 52.243-4, Changes (JUL 2025) (Deviation),
VAAR 852.243-70, Construction Contract Changes Supplement (SEP 2019).
Â
The agency will follow the procedures located at FAR 43, VAAR 843 and VAAM M843. The Contracting Officer will make the final decisions for items not addressed by regulation or policy.
Â
The agency's past performance, for the prior 3 fiscal years, regarding the time required to definitize equitable adjustments for change orders under construction contracts will be posted as soon as it is available.
Â
Additional Acquisition Information:
Â
All responsible sources may submit a quotation, bid, or proposal, as appropriate, which will be considered by the agency.
Â
At the time of submission of offers/quotes, and at the time of award of any contract, the offeror must represent to the contracting officer that it is a SDVOSB/VOSB eligible under this subpart, small business concern under the North American Industry Classification System (NAICS) code assigned to the acquisition and certified SDVOSB/VOSB listed in the SBA certification database at https://search.certifications.sba.gov.
Â
A joint venture may be considered eligible if it meets the requirements in 13 CFR part 128, and the managing joint venture partner makes the representations. To receive a benefit under the Veterans First Contacting Program, an otherwise eligible SDVOSB/VOSB certified pursuant to 13 CFR 128, must also meet SBA requirements at 13 CFR parts 121, 125, and 128 including the nonmanufacturer rule requirements at 13 CFR 121.406(b) and limitations on subcontracting at 13 CFR 125.6. The nonmanufacturer rule (see 13 CFR 121.406) and the limitations on subcontracting requirements apply to all SDVOSB and VOSB set-aside and sole source contracts above the micro-purchase threshold. In addition, an offeror shall submit a certification of compliance to be considered eligible for any award under this part (see 819.7004). Pursuant to 38 USC 8127(g), any business concern that is determined by VA to have willfully and intentionally misrepresented a company s SDVOSB/VOSB status is subject to debarment from contracting with the Department for a period of not less than five years. This includes the debarment of all principals in the business.
Â
System updates may lag policy updates. The System for Award Management (SAM) may continue to require entities to complete representations based on provisions that are not included in this solicitation. Contracting officers will rely on representations from offers based on provisions in the solicitation. Entities are not required to, nor are they able to, update their entity registration to remove these representations in SAM.
Â
End of Presolicitation Notice
The work includes replacement and expansion of the secondary electrical distribution system serving A-Wing of Building 1 and expansion and modification of the existing primary Medical Center campus electrical distribution system as required to support those improvements, including work associated within Building 01 (A-Wing), Building 23, and adjacent exterior/campus utility areas as indicated in the contract drawings and specifications.
We post new electrical opportunities in Ohio as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""45428""DAYTON""OH""USA""VISN 10 CONSOLIDATED CONTRACTING""4100 WEST 3RD STREET""36C25027B0002.docx"26455"file"".docx""1""2026-10-07T13:53:12.595+00:00""60a0f971117e43a996ee756bbf339433""public""0""public""a4b3c82ce7c449d6a5aeb0c1ddffd7a2""0"1"0""https://vaww.insider.va.gov/"0"link""1""2026-10-07T13:53:12.595+00:00""eca625ccbb47444fb40cddc03a4de5ff""public""0""https://vaww.insider.va.gov/""public""6a3a3bf37bb7479e8bef7e22f8b095a6""0"1"0"Most Ohio work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 7d289bea83eb49708aa2232e2ce8262b), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.