USCGC RESOLUTE FY27 AVIATION AVAILABILITY (DS/AA)
POC: Monica Paul, monica.w.paul@uscg.mil
The contractor must perform seven work items: (1) load test the 28 VDC helo power supply; (2) load test the 400 Hz power supply (FCX Systems Inc); (3) remove and reinstall both port and starboard anemometer wind speed transmitters; (4) inspect and calibrate the JP-5 flow meter; (5) inspect and test the helo talon grid system on the flight deck; (6) preserve the helicopter operating areas/flight deck; and (7) renew electrical stuffing tubes. The work includes providing a qualified technical representative for the 400 Hz power supply, submitting condition found reports, critical inspection reports within the first 25% of the contract period, and all other inspection reports within the first 40% of the contract period. The contractor must also provide a production schedule, work package network, manpower loading curves, trade manning curves, and a subcontracting list within three working days of the vessel's arrival.
We post new goods & materials opportunities in Virginia as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""23510""NORFOLK""VA""USA""300 EAST MAIN ST, STE 950, VESS DIV""70Z08026QMECP0026P0001 Q_A.pdf"229324"file"".pdf""1""2026-09-02T15:54:20.697+00:00""8d94c5695bc241388628fa173533ee8b""public""0""public""14af43cba45f4b28af3147ade7c4e68d""0"6"0""70Z08026QMECP00260001_KO SIGNED.pdf"681687"file"".pdf""1""2026-09-02T15:54:20.697+00:00""e11749929d904007a054ccc4b0b919d2""public""0""public""59e5467b29fe4870b0aa7181309167d6""0"5"0""PRICE SCHEDULE CGC RESOLUTE FY27 AA.xlsx"21226"file"".xlsx""1""2026-08-19T17:26:37.127+00:00""f223ab42e34c466b91021fb5e29f3429""public""0""public""4981c6a40beb43c5901f49a4b9a11039""0"4"0""SPECIFICATION OF WORK CGC RESOLUTE FY27 AA.pdf"628755"file"".pdf""1""2026-08-19T17:26:37.127+00:00""e80164015ae949e2959112761a407976""public""0""public""a1d66b7c3d1e4248a389a314a04e311a""0"3"0""STATEMENT OF WORK CGC RESOLUTE FY27 AA.pdf"525351"file"".pdf""1""2026-08-19T17:26:37.127+00:00""2e91ec3a2a72447cbce237ba7acfb89f""public""0""public""c21d476c826d4df3ae5867dfece1d7f9""0"2"0""70Z08026QMECP0026.pdf"210199"file"".pdf""1""2026-08-19T17:26:37.127+00:00""67168b69da254c57be1d19992c1326be""public""0""public""4feb359ac03149bf96231def13e586bd""0"1"0"Most Virginia work asks for the two below, and the solicitation documents are where it’s stated. Here’s what each costs through Light RFP if you need one.
Source: SAM.gov (notice 7baf27d00df240b4a6862587ab024e35), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.