**Modified on 11/20/2026 to add the revised SOW in attachments that includes additional photos and information. **
Modified on 11/18/2026 to add revised RFQ in attachments that includes job walk instructions, PPE, and information needed for the badging office.
See attachments for the Statement of Work due to the length not posted here.
This is a requirement for Removal, refurbishment, and reinstallation of two (2) 200 HP General Electric (GE) induction motor at the Unitary Plan Wind Tunnel facility per the SOW.
This procurement is set aside for small business.
VENDORS MUST REFERENCE THE NOTICE ID WHEN SUBMITTING A QUOTE IN THE SUBJUECT LINE**.**
The following information should be included in your quote.
Net 30
FOB Destination
Please provide your Cage Code & UEI # on your Quote.
Please provide ARO delivery time/Lead Time on your Quote.
If shipping is applicable, please provide on your Quote.
Please apply any discounts to your Quote.
NOTE: We will not be paying with a Credit Card.
The contractor must perform pre-removal vibration analysis on each motor, safely disconnect all electrical connections, supply rigging equipment to remove the approximately 2100 lb motors, transport them to the contractor's facility for refurbishment (including dismantling, cleaning, inspecting, rewinding stator, dynamic balancing, installing new bearings, and painting), transport the refurbished motors back, reinstall them with new mounting bolts and precise alignment, conduct post-installation vibration analysis, and perform functional testing to verify performance meets manufacturer specifications. The contractor must also provide a lift plan, detailed reports, and a 1-year warranty.
We post new goods & materials opportunities in Mississippi as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""39529""STENNIS SPACE CENTER""MS""USA""JERRY HLASS ROAD, BLDG. 1111""SATPC0043179 Tab 04 4 SOW Rev 2.pdf"1947342"file"".pdf""1""2026-11-20T17:05:16.721+00:00""12eaea06cbe942bc9df3511041bbb271""public""0""public""2a90a2767b43495fa6f36654f8aa292f""0"3"0""SATPC0043179 Tab 10 RFQ Open Market Rev.pdf"352876"file"".pdf""1""2026-11-18T20:04:31.354+00:00""aba42ba55b3f4cb7b268375942b033b5""public""0""public""08669b3fad2e47a6a68c591f20734d91""0"2"0"Most Mississippi work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what an agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 77603ca6adec452a8f54cfa392485087), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.