This Area of Interest (AOI) is issued under the Air Force Research Laboratory (AFRL) Rapid Infrastructure for Science and Experimentation ('RISE') parent notice FA8652279-RISE pursuant to 10 U.S.C. § 2808a. Refer to the attached AOI document and attachments for submission instructions, technical requirements, and assessment criteria.
To optimize the work environment and facility functionality for personnel in the 2nd Floor hallway of Building 556, Acquisition Management Complex, Wright-Patterson Air Force Base, Ohio. This project transforms an existing standard entrance hallway into a modern, motivating environment that reinforces the strategic deterrence mission and heritage of the USAF Bombers community through bomber-specific environmental wall graphics, heraldry shields, structural scale models, historical elements, painting, architectural finishes, decals, and visual enhancement using existing space and structures.
Target Timeline: The entire project must be completed within ninety (90) calendar days of award: Stage 1 Design Plan (30 days), Stage 2 Sourcing & Fabrication (60 days), and Stage 3 Physical Implementation & Closeout (90 days). On-site physical installation shall not exceed thirty (30) calendar days from physical site commencement and shall not restrict access to 2nd Floor restroom facilities for more than thirty (30) contiguous minutes.
The contractor shall design, source, fabricate and install a heritage hallway enhancement in the 2nd Floor hallway of Building 556, including bomber-specific environmental wall graphics, heraldry shields, four ceiling-suspended structural scale models (B-52, B-1, B-2, B-21), historical elements, painting, architectural finishes and decals. Models and hardware must be UV-resistant and thermally stable for direct sunlight, use commercial architectural-grade adhesives with edge-sealing, and maintain egress and head clearance. Work occurs in an occupied headquarters facility on a 90-day schedule with Design Plan at 30 days, Sourcing and Fabrication at 60 days, and Physical Implementation and Closeout at 90 days, with on-site installation not exceeding 30 days, 0800-1700 hours, daily dust and debris cleanup, and restroom access restriction limited to 30 contiguous minutes.
We post new exterior maintenance opportunities in Ohio as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"45433-7132""WRIGHT PATTERSON AFB""OH""USA""CP 937 904 9700""1864 4TH ST BLDG 15 RM 260""AOI Final OT Bombers.pdf"177195"file"".pdf""1""2026-11-23T14:53:42.579+00:00""d7286391853742d39955bb6b6957858d""public""0""public""ce2fb93f01b3448b80b9e2a8ee9a142d""0"4"0""Bombers Heritage Hall PWS - 13 Nov 26.docx"202760"file"".docx""1""2026-11-23T14:53:42.579+00:00""66ea131bb5c64389a57dbc3b7df19e81""public""0""public""dd5b953136b54a69a23d0fefd0e8999e""0"3"0""2808a_OT_Articles_Bombers_Hallway_Project_FINAL.pdf"137083"file"".pdf""1""2026-11-23T14:53:42.579+00:00""96fb13de15d742db82759a40a687c0f7""public""0""public""ace17f3926ae427f9943d83c8737ff3e""0"2"0""Bombers Heritage Hall diagram.pptx"151760"file"".pptx""1""2026-11-23T14:53:42.579+00:00""87d2ecbe064c4242bc2382632947d2b6""public""0""public""28d0d094f41246a38bb7f1d6b8dceda3""0"1"0"Most Ohio work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 772b6b465acf4e8b9c17cf74ac4c50a7), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.