This is a Solicitation Synopsis issued by the Department of the Air Force, Air Force Nuclear Weapons Center (AFNWC/NIKM), Hill AFB, UT. This solicitation is for the production and delivery of flight test kit replenishment spares for the Flight Test, Telemetry, and Termination (FT3) Program.
These kits directly support the Air Force Global Strike Command (AFGSC) Minuteman III (MMIII) Intercontinental Ballistic Missile (ICBM) Force Development Evaluation Operational Test Launch (OTL) Program.
The Government intends to solicit and negotiate with only one source: The Boeing Company (CAGE: 0B0D7), located in Layton, UT, under the authority of 10 U.S.C. 3204(a)(1), as implemented by RFO 6.103-1 (Only One Responsible Source and No Other Supplies or Services Will Satisfy Agency Requirements).
Market research, including a Sources Sought Synopsis (FA8214-25S-FT3PD) and Pre-solicitation Notice (FA821426RB004-PRESOL), concluded that Boeing is the only source with the unique technical data, specialized engineering expertise, and established manufacturing infrastructure required to meet the Government's strict performance schedules. Award to any other source would result in an estimated minimum duplication of $80M in costs and an unacceptable delay of at least three (3) years.
The resulting contract is anticipated to be a Firm-Fixed-Price (FFP) vehicle containing the following primary parameters:
Quantity: Production and delivery of twenty-five (25) FT3 flight test kits.
Delivery Schedule: Just-in-time delivery to Vandenberg Space Force Base, CA, precisely 120 days prior to scheduled Operational Test Launches (OTLs).
Period of Performance: October 2027 through September 2035.
Total Estimated Program Value: Approximately $955M (including potential future procurements executed under an approved Class J&A).
This notice is not a request for competitive proposals, and a written solicitation will be issued directly to The Boeing Company. However, any responsible source that believes it can meet these requirements may submit a capability statement, proposal, or quotation, which shall be considered by the agency.
Information received will be evaluated solely to determine whether to conduct a competitive procurement in the future. A determination by the Government not to compete this proposed contract based upon responses to this notice is solely within the discretion of the Government.
All responses must be submitted electronically to the Points of Contact listed below no later than the Response Deadline indicated in this posting.
The contractor shall manufacture, produce and deliver 25 FT3 flight test kits using approved technical data, procuring parts and materials, assembling and testing Integrated Instrumentation System and Flight Destruct System components at Boeing-Heath, storing kits until required, and providing just-in-time delivery to Vandenberg Space Force Base 120 days prior to operational test launches with data deliverables, travel support and requalification effort through September 2035.
We post new goods & materials opportunities in Utah as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"84056-5837""HILL AFB""UT""USA""CP 801 586 8482""6008 WARDLEIGH RD BLDG 1580""FT3 Production Follow-On Request for Proposal Memo_17 Nov 26.pdf"1977281"file"".pdf""1""2026-11-17T20:19:25.248+00:00""368fe166d3054361bed01a50e2affe8b""public""0""public""40c84503f96049fea102cd19e80f859a""0"47"0""1. FT3 PWS_Production Follow-On Final_17 Nov 26.pdf"408328"file"".pdf""1""2026-11-17T20:19:25.248+00:00""be8adacde0864c428b56f2c07f5f11b0""public""0""public""aebedea25ddb493ebc01226d70819c65""0"43"0""2. FT3 Production Follow-On GRID.docx"74780"file"".docx""1""2026-07-07T23:04:32.317+00:00""68957a74fd1e4d4784ff4a80c8d4b8c7""public""0""public""9715e057dbdb4e7fb1e775bc4a4f0ef7""0"38"0""3. FT3 Production Follow-On CDRL Package 4 Nov 2026.docx"562854"file"".docx""1""2026-11-17T20:19:25.248+00:00""82ca13ee26ba478f80d4d6ea3b4cd575""public""0""public""f3a282fb6cd6498c9e664bf89c7059e6""0"35"0""4. FT3 Production Follow-On CLIN Structure.xlsx"11995"file"".xlsx""1""2026-11-17T20:19:25.248+00:00""e1c5105511d940d593cc425d45e1ac74""public""0""public""2a1009c156264f62a975200635928b20""0"33"0""5. Solicitation - FA821426RB004 Rev 17 Nov 2026.pdf"729715"file"".pdf""1""2026-11-17T20:19:25.248+00:00""ad47ceda07424edb9c7ec6758dc54905""public""0""public""b331b00a57ff49369b9550b7cc3e7109""0"32"0""6. AFNWC-NIMS OPSEC Addendum.docx"44998"file"".docx""1""2026-07-07T23:04:32.317+00:00""3eddd3d63f2a4f7e9068d9b44652c916""public""0""public""2c3306757aca4e9eaa8d5156ab7a465e""0"31"0""7. FT3_VSFB_locations for shipping Attachment.xlsx"9888"file"".xlsx""1""2026-07-07T23:04:32.317+00:00""e78a48767d97476aa57ba4352976994b""public""0""public""481d0ea1cf524e0ea60728436a2b38eb""0"30"0""FT3 Production Follow-On Request for Proposal Memo_updated 7 July 26.docx"250398"file"".docx""1""2026-07-07T23:04:32.317+00:00""95c7721bb59448e29cc5b9d53fac2e9a""public""0""public""8e8da3ad6fa948d2b8ea7ec55598ee69""0"29"0""1. FT3 PWS_Production Follow-On_1 Jun 26v1.docx"105244"file"".docx""1""2026-07-07T23:04:32.317+00:00""d2063d9312e144139479ae2a7caa0c78""public""0""public""85131c9d4dfa485f9dd86a5cac4c9f1b""0"28"0""3. FT3 Production Follow-On CDRL Package 24 Apr 2026.docx"263833"file"".docx""1""2026-07-07T23:04:32.317+00:00""7300ec740c5c4b2e9c843d5f4f592257""public""0""public""3cb77f474d91440d8c32c517d51b8830""0"23"0""4. FT3 Production Follow-On CLIN Structure_Draft May 26.xlsx"19786"file"".xlsx""1""2026-07-07T23:04:32.317+00:00""067fb0621fd1488cbd59c1d45a2780b6""public""0""public""e65ef5214d7a49469b025ef19a022603""0"22"0""5. Solicitation - FA821426RB004.pdf"725482"file"".pdf""1""2026-07-07T23:04:32.317+00:00""be2de1143509438dae2c6c421af75c1f""public""0""public""ad20b9c55a7347d7a6299e7d2f5b4898""0"21"0"Most Utah work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what an agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 7722def55a3c4672b1e0c9c4590e6871), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.