END OF SOLICITATION
The Contractor shall furnish all labor, materials, tools, transportation, equipment, supervision, and incidental services to: coordinate a pre-installation site walk within 10 calendar days after award; procure two new TAA-compliant laser/LED projectors meeting minimum specifications (e.g., WUXGA resolution, 20,000-hour illumination life, embedded warping/blending, Crestron-compatible control); remove and palletize the two existing Christie WU7K-M projectors for Government turn-in; install the new projectors in existing mounting locations after hours (M–F, 4:30 PM–8:30 PM local time) within no more than five consecutive after-hours workdays; fully integrate and program the projectors with the existing Crestron control system; perform system testing, image optimization, and end-user demonstration; and deliver as-built documentation, warranties, and disposal certificates. All on-site work must be completed within 60 calendar days after contract award.
We post new electrical opportunities in Florida as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""33637""TAMPA""FL""USA""8875 HIDDEN RIVER PARKWAY""ATTACHMENT C PAST PERFORMANCE QUESTIONNAIRE.docx"30538"file"".docx""1""2026-10-07T14:29:55.023+00:00""02400433af29452ba8b2881bb71e93ed""public""0""public""1174c97b18cf4ad0b0f97c9386a7151e""0"4"0""ATTACHMENT B TECHNICAL CAPABILITY WORKSHEET.docx"22685"file"".docx""1""2026-10-07T14:29:55.023+00:00""4d7dba51990a4c42b1019c674e299014""public""0""public""1e2c8816278945e397e9c0833b4129c4""0"3"0""ATTACHMENT A REQUEST FOR INFORMATION.docx"18748"file"".docx""1""2026-10-07T14:29:55.023+00:00""b5e14e1a12db4d75a804bf64637afa05""public""0""public""e5ea94a33bea4e6a923d8bb20111c759""0"2"0""36C24827Q0036_1.docx"87398"file"".docx""1""2026-10-07T14:29:55.023+00:00""8ac5eda9db2f49f6bc620efbe2cb2ad3""public""0""public""7b8c8d8f5b9e48c49305b87c175c5342""0"1"0"Most Florida work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 76de40aee54f4c22949953de4016ff82), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.