Aviation Availability: USCGC HARRIET LANE FY27 AA
Period of Performance: 03/01/2027 - 03/30/2027
Place of Performance: Joint Base Pearl Harbor Hickam, HI
The contractor must perform 14 definite work items: load test the 28 VDC helo power supply; load test the 400 Hz power supply (FCX Systems Inc); remove and reinstall both port and starboard windspeed transmitters (anemometers); calibrate the aviation fuel flow meter; inspect and test the helo talon grids; preserve helicopter operating area decks; renew the hangar joint; repair hangar stationary station plating; renew interior wet and dry deck covering; clean and inspect aviation fuel service tanks; clean and inspect aviation fuel stowage and overflow tanks; and renew hull plating and line up light. Two optional items cover partial preservation of aviation fuel service and storage tanks. The contractor must also provide all required insurance, comply with environmental protection requirements, submit critical inspection reports within the first 25% of the contract period, and follow SFLC Standard Specifications for welding, preservation, and electrical testing.
We post new goods & materials opportunities in Hawaii as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""23510""NORFOLK""VA""USA""300 EAST MAIN ST, STE 950, VESS DIV""Amendment 0001_Questions_Answers.pdf"67019"file"".pdf""1""2026-09-21T21:20:33.354+00:00""4db25fee0cc741a099ae4efe63aa1984""public""0""public""4c9aba27e59b499782d6bc5a67d8257e""0"6"0""Amendment 0001.pdf"736362"file"".pdf""1""2026-09-21T21:20:33.354+00:00""b7b2223d00bc44a8ad61395c14c8a911""public""0""public""8ba3bfcb1c6a4c43aa51a59d864cf5ff""0"5"0""Attachment II - Statement of Work - Specification.pdf"1008734"file"".pdf""1""2026-09-10T20:16:46.591+00:00""0b77c6a8860e4ab5ad082bb83f28ae97""public""0""public""5a023c8710f34e7f9970d6c9697ec9e8""0"4"0""Attachment I - Schedule of Services - Blank Price Schedule.xls"43520"file"".xls""1""2026-09-10T20:16:46.591+00:00""72fed698eb8344f09add3db153d2c043""public""0""public""dde583d2c8a7480bbcfa754e72ca641a""0"3"0""STATEMENT OF WORK.pdf"164270"file"".pdf""1""2026-09-10T20:16:46.591+00:00""f698c95927c449db90c7fcc36edbffb7""public""0""public""5ea2d5439317444cb4806fc78a3c0a30""0"2"0""70Z08026QMECP0031.pdf"311811"file"".pdf""1""2026-09-10T20:16:46.591+00:00""aa018a0569df4159b46b8be13791fd35""public""0""public""a5efd00b7daa4926a960c7a8b4e72d6e""0"1"0"Most Hawaii work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what an agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 76bd39478bb54f25a16f83cf1d0e5a33), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.