10 Each - MANDREL ASSEMBLY per Drawing #G5573D REV. A, G5507C Rev. H Applies.
Assembly consists of parts:
G5571F Rev.D
G5572D Rev.B
G5574C Rev.B-Item #2
G5579B Rev.C-Item#2
Contractor to mark mandrel assembly and packages per drawing #G5573.
Vendor to submit Material Certs, Heat Treat Certs, Finish Certs, Inspection Reports
upon delivery.
** Inspection Required**
The contractor must manufacture 10 each MANDREL 155MM ASSY ROTARY FORGE per Drawing #G5573D REV. A, with G5507C Rev. H applying. The assembly consists of parts G5571F Rev.D, G5572D Rev.B, G5574C Rev.B-Item #2, and G5579B Rev.C-Item#2. The contractor must mark the mandrel assembly and packages per drawing #G5573 and submit Material Certs, Heat Treat Certs, Finish Certs, and Inspection Reports upon delivery. Wrought steels selected must conform to a standard AISI grade or designation; merchant quality, leaded, resulfurized, rephosphorized, or castings are not acceptable. The pricing arrangement is Firm Fixed Price.
We post new goods & materials opportunities in New York as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"12189-4000""WATERVLIET""NY""USA""KO CONTRACTING OFFICE""1 BUFFINGTON ST BLDG 10""W911PT26QA139-0001.pdf"3889888"file"".pdf""1""2026-10-20T12:09:59.366+00:00""036a6d26a8354bbda1e986110cc5beef""public""0""public""e5f4139313e44caf80cfc15cf7690656""0"8"0""W911PT26QA139.pdf"3355963"file"".pdf""1""2026-09-29T14:47:43.104+00:00""fd6594b49bd64843b0b8d706dcfbfeeb""public""0""public""2a82c776ee9a4e6ab4753627d0657220""0"7"0""G5571 Layout1 (1).pdf"77832"file"".pdf""1""2026-09-29T14:47:43.104+00:00""b420293cd5004f42bde28adc3db9e711""private""0""controlled""2284e15bd953428e87a22b2bbf6078b8""1"6"0""G5507.pdf"133924"file"".pdf""1""2026-09-29T14:47:43.104+00:00""9aa5987a05a74120a1d3f72b58e0fa1f""private""0""controlled""d61f892051464d24bb7ec37ea9d8b633""1"5"0""G5572 Layout1 (1).pdf"73422"file"".pdf""1""2026-09-29T14:47:43.104+00:00""04c984238f1e4dc0afe8506c85d3213b""private""0""controlled""ee6ed6cd369549bb9419808a790b36e4""1"4"0""G5574 Layout1 (1).pdf"56147"file"".pdf""1""2026-09-29T14:47:43.104+00:00""e87b56c7ec2541fc9e1cbe03c1cad8c9""private""0""controlled""23e1808fa2e24290a99e9455e7a12dc3""1"3"0""G5573 Layout1 (1).pdf"59671"file"".pdf""1""2026-09-29T14:47:43.104+00:00""af0387fe2a1e44418ba2d5a63c8b9564""private""0""controlled""24f6be25ebc1458cbe3d1fb16c84753c""1"2"0""G5579 Layout1 (1).pdf"41421"file"".pdf""1""2026-09-29T14:47:43.104+00:00""418ec4b83ad84d25be1e8b7e09774f1b""private""0""controlled""2b6d3ce0e133462894bee27d00952a3e""1"1"0"Most New York work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what an agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 76a18b1d2778422e911805917ea09ff1), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.