Battelle is requesting a proposal as noted in the attached RFP, Technical Specification, and
drawing documents. Please also provide the following with the proposal:
Lead time
Completed Reps & Certs form
Capability statement
If there are any questions in regard to the request, please feel free to contact me directly.
Thanks
Chris Martin
Contracting Specialist
Pacific Northwest National Laboratory
Phone: 509-372-6026
E-mail: Christopher.martin@pnn
The contractor shall perform non-recurring engineering and tooling design for items 4, 5, and 6 if needed; produce first articles per Table 1 for Battelle evaluation; and may propose multiple production techniques for evaluation. The contractor shall ship intermediate products according to Table I, with each component individually vacuum sealed and packaged per associated drawings. The contractor must present tooling design prior to first article fabrication, provide material certification from an accredited ISO/IEC 17025:2017 laboratory, submit a Certificate of Conformance, and report any non-conformances. The contractor shall also mark each plate and sheet per drawing, package items in 4,000 lb maximum fiber-enclosed skids with wooden sides and battens, and ensure surfaces are smooth and free from defects.
We post new goods & materials opportunities in Washington as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"Richland""WA""US""2345 Stevens Drive""99352""Richland""WA""USA""Pacific Northwest National Lab""P.O. Box 999""REPS and CERTS_964171_0.00.pdf"211122"file"".pdf""1""2026-10-27T15:39:38.538+00:00""84117782a5834580bec80cafebfd3fbf""public""0""public""e9a6359c92f645959442504f84b22a58""0"6"0""Appendix A - Alternative_Cladding_Technical Specification_RFP 964171.pdf"128002"file"".pdf""1""2026-10-27T15:39:38.538+00:00""0e8aa70d2f924c77be7d617ff73196e2""public""0""public""67c0561624404281a945720f42aebd75""0"5"0""RFP_0000964171_0.00.pdf"202357"file"".pdf""1""2026-10-27T15:39:38.538+00:00""15d70c90c90246e885f72931201181df""public""0""public""395f84278330442ebc8213f264045200""0"4"0""Drawing - 0.011_Pocket_Depth-cladding_MITR.pdf"64130"file"".pdf""1""2026-10-27T15:39:38.538+00:00""5a8abd2a47d84237a5fdbbf26f9604a8""public""0""public""0c47511ea3ba43e386dda83a217dd2f1""0"3"0""Drawing - 0.0145_Pocket_Depth-cladding_MITR.pdf"64042"file"".pdf""1""2026-10-27T15:39:38.538+00:00""c607338835c947d8bf592f8ee3d8c34a""public""0""public""c7c82f5a63b2484f82c5b1a1900ee24d""0"2"0""Drawing - 0.0085_Pocket_Depth-cladding_MITR_(1).pdf"64005"file"".pdf""1""2026-10-27T15:39:38.538+00:00""4e795f416b1c41ae98dc9793dfd107d4""public""0""public""7b643f6736b342b7a6eee1c6e6d56823""0"1"0"Most Washington work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what an agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 75b6357314164588a579f1db541e3198), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.