See attached RFQ and SOW
PLEASE REFER TO THE Q&A DOCUMENT ATTACHED
PLEASE REFER TO UPDATED SOW
The contractor must furnish and deliver 20 LF of 4-inch seamless SCH 160 ASTM A312 GR 304/304L pipe, 40 LF of 2-inch seamless SCH 160 ASTM A312 GR 304/304L pipe, 20 LF of 6-inch seamless SCH 10S ASTM A312 GR 304/304L pipe, one 4x2 reducing weld-o-let (SCH 160), one 4x2 reducing weld-o-let (SCH XXS), eight 6-inch tees (SCH 10S), one 6-inch cap (SCH 10S), eight 6-inch flanges (300# Weld Neck Raised Face, SCH 10S bore), eight 6-inch blind flanges (300# Raised Face), and one 4-inch 90-degree long radius elbow (SCH XXS, ASTM A234 WPC carbon steel). All items must be dual-rated 304/304L stainless steel unless otherwise specified. Delivery is FOB Destination to Bldg. 9166, Stennis Space Center, MS 39529-6000, Attn: Jonathan Lee, with a 16-week lead time after receipt of order. Material test reports or approved equal must be provided for each line item.
We post new goods & materials opportunities in Mississippi as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""39529""STENNIS SPACE CENTER""MS""USA""JERRY HLASS ROAD, BLDG. 1111""SATPC0042854 Tab 04 4 SOW UPDATED.pdf"120035"file"".pdf""1""2026-10-08T18:02:09.07+00:00""23ddccc837f14f818117070342e4b9e8""public""0""public""30f4802b9e8b43159c692a302c7203f5""0"4"0""SATPC0042854 Tab 10 Open Market RFQ Questions.pdf"32563"file"".pdf""1""2026-10-08T16:45:41.921+00:00""9fe2897cfe9d4ef9aa90fdce3e0299d3""public""0""public""ef8f93802069473aa8aaf937f9a0a672""0"3"0""Tab 04 SOW.pdf"183051"file"".pdf""1""2026-10-05T18:53:14.995+00:00""b40b5075a3b442b896744bd4cdbd3508""public""2026-10-08T18:02:09.07+00:00""1""public""fedc80b0dc8649fcbc1a5df784eb7e5a""0"2"0""2026-10-08T18:02:09.07+00:00""Tab 10 RFQ 80NSSC27944832Q.pdf"225296"file"".pdf""1""2026-10-05T18:53:14.995+00:00""952c3e14c60f49e19e7c829ddcb290c2""public""0""public""59ef163a160b4618afd98cfad797d027""0"1"0"Most Mississippi work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what an agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 726ea72f382d4e0faf9527a754a3fc23), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.