We'll email you new asphalt opportunities in Utah as agencies publish them — free, unsubscribe whenever.
And get prequalified now, so the bond is never the scramble on the next one. Prequalify for bonding →
Amendment 0001 Q&A has been added Date: 22 October 2026
Amendment 0002 Final revised Q&A has been added Date: 05 November 2026
Amendment 0003 issued for the following reason:
Correct formulas that has multiple QTY to add final totals accurately
Update Section L Instructions, Conditions, & Notices to Offerors or Quoters
Extend the IFB Solicitation date until Tuesday 24th November 2026 1:00 MST
Bid opening will occur on Tuesday 24th November 2026 1:00 MST
Replace current Amendment 0002 attachment in SAMs from Conformed Copy SF 1442 to Amendment SF30 f.
PROJECT TITLE: MISCELLANEOUS PAVING REQUIREMENTS
PROJECT LOCATION: U.S. ARMY DUGWAY PROVING GROUND, UTAH
DESCRIPTION: THIS IS AN INDEFINITE-DELIVERY, INDEFINITE-QUANTITY (IDIQ), FIRM-FIXED PRICE REQUIREMENT FOR MISCELLANEOUS PAVING CONSTRUCTION SERVICES. ANY WORK REQUIRED BY THE GOVERNMENT SHALL BE ACCOMPLISHED BY THE ISSUANCE OF TASK ORDERS BY THE CONTRACTING OFFICER AGAINST THE PROPOSED CONTRACT. THE PERIOD OF PERFORMANCE (POP) FOR THIS REQUIREMENT IS A TWELVE (12) MONTH BASE PERIOD AND FOUR (4) ONE (1) YEAR OPTION PERIODS OF ONE YEAR EACH. THE ESTIMATED MAGNITUDE IS UP TO $5,000,000.00 ANNUALLY.
THE NAICS FOR THIS ACQUISITION IS 237310, HIGHWAY, STREET, AND BRIDGE CONSTRUCTION (SMALL BUSINESS SIZE STANDARD $45 MILLION).
PER FEDERAL ACQUISITION REGULATION (FAR) 19.108, THIS REQUIREMENT IS RESTRICTED TO 8(A) FIRMS AUTHORIZED BY THE SMALL BUSINESS ADMINISTRATION'S UTAH DISTRICT OFFICE TO PERFORM WITHIN THE DISTRICT'S GEOGRAPHICAL REGION.
Offers shall be received prior to the closing date and time identified on SF 1442 (18 November 2026 by 1300 MDT) to the following address:
Contract Specialist: Nicholas J. Rowton; Email Address: nicholas.j.rowton.civ@army.mil
Contracting Officer: Jim Keetch; Email Address: Alfred.j.keetch.civ@army.mil
Note: Please include Bid Submission and solicitation number W911S6-27-B-A001 in the subject line of the email. Example Subject Reference: Bid Submission W911S6-27-B-A001 DPG Horizontal Construction Paving
Bid Opening will be Wednesday 18 November 2026 promptly at 1300 MDT at Dugway Proving Ground Building 5330 Valdez Circle conference room 1201, no bids will be accepted or considered after that time.
Site Visit: The Government will hold a virtual site visit only.
Bidders are required to submit a completed SF 1442, including the acknowledgement of all amendments in Block 19.
SF 1442 cannot be accepted without being signed. The SF 1442 must be completed in full by the bidder, to include the Name and Title of the Person Authorized to sign in Block 20a, an original signature in Block 20b, and the Bid Date in Block 20c. Bids cannot be accepted and will be declared non-responsive without a valid signature in Block 20b.
The final total bid price(s) from Technical Exhibit 01 must be annotated on the appropriate CLINs of Section B of the solicitation.
Refer to Section L for additional details
Miscellaneous paving construction services including mobilization and demobilization of paving equipment (asphalt pavers, concrete pavers, curb and gutter machines, cranes, and milling machines); temporary road construction with gravel fill; demolition of bituminous and concrete pavement, curbs, gutters, sidewalks, utilities, and traffic control devices; saw cutting; concrete slab placement; grading and soil stabilization; erosion control; asphalt and concrete paving for roadways, parking lots, and airfields in various specifications and thicknesses; curb and gutter construction; drainage structures; pavement markings in various widths and types; airfield markings; and signage removal and installation.
"84022-5000""DUGWAY""UT""USA""KO DIRECTORATE OF CONTRACTIN""5330 VALDEZ CIRCLE""TE-01 Contract Line Items Proposal Template Base plus 4 Year-rv1.xlsx"214380"file"".xlsx""1""2026-11-17T20:42:00.672+00:00""22187e41ed034120afe92b93538f1466""public""0""public""f05e6baed0a948b3bfebfd1886576861""0"39"0""Solicitation Amendment W911S627BA0010003 SF 30.pdf"3911255"file"".pdf""1""2026-11-17T18:52:12.627+00:00""dd19a85013e64d6ebb14680c0ccfff61""public""0""public""ac3b3659d0ad4fd78ebc467a410c4531""0"38"0""TE-01 Contract Line Items Proposal Template Base plus 4 Year-rv1.xlsx"212851"file"".xlsx""1""2026-11-17T18:52:12.627+00:00""d8a54e082c28484dbb4c5255b9e6246f""public""2026-11-17T20:42:00.672+00:00""1""public""e0ae6dc27f2e4fa5a5b000f2ad74e83d""0"37"0""2026-11-17T20:42:00.672+00:00""Solicitation Amendment W911S627BA0010002 SF 30.pdf"6477542"file"".pdf""1""2026-11-17T18:52:12.627+00:00""3ac21cdb45ed43ada32e8e34ba475d92""public""0""public""9fb7c72f52fa43f0bcc287e4df364a16""0"36"0""Question and Answers IFB W911S6-27-B-A001-102226.pdf"44844"file"".pdf""1""2026-10-22T21:54:03.734+00:00""09a13035e5764d7a93639e126a52c8ee""public""0""public""ce683a6455504ae1bc9b7a7386d2bd3b""0"34"0""Solicitation Amendment W911S627BA0010001 SF 30.pdf"4014500"file"".pdf""1""2026-10-22T21:54:03.734+00:00""21bf4743706b494ab70edf4b89e00b90""public""0""public""d50087f5e07e404fb514fb93ddb39082""0"33"0""1442-Solicitation W911S627BA001 DPG Horizontal Construction 101426.pdf"6685546"file"".pdf""1""2026-10-14T18:43:22.13+00:00""21ce9d485f0d4fe990f6820bab9c2c07""public""0""public""4a4b6545124145a688c2ffbc2ee29fbc""0"32"0""Attachment 1 Scope of Work W911S6 Construction Horizontal FY27 - FY 31.pdf"452434"file"".pdf""1""2026-10-14T18:43:22.13+00:00""67558e3c4bb6482e921fe87e8cc6991c""public""0""public""39b585e2cbac46778777de438f1f235b""0"31"0""Attachment 2 Dugway Proving Ground Paving IDIQ Virtual Site Visit.pptx"13907850"file"".pptx""1""2026-10-14T18:43:22.13+00:00""e043e07d17b54963be0ed0395255a1b8""public""0""public""99a202a25c7e41bdbb1885143019f31c""0"30"0""DPG_Paved_Roads_2026.pdf"697867"file"".pdf""1""2026-10-14T18:43:22.13+00:00""3ee6abad29184f3784a10c9f78eb6491""public""0""public""86f6411e1d7c415fb625e02963133980""0"29"0""TE-02 Standard Specification Book Rev 9 June 2025.pdf"1863628"file"".pdf""1""2026-10-14T18:43:22.13+00:00""0215b028cc26478fbc6871dd8cf05602""public""0""public""6b79c02501614e508cf9de641cda7891""0"27"0""TE-03 Paving IDIQ Airfield Specifications.pdf"2320514"file"".pdf""1""2026-10-14T18:43:22.13+00:00""3fd90c60c5c7421c9bedb2d966e6ec81""public""0""public""b15379d671a54cf98c1a665da28b6b1f""0"26"0""TE-04 Standard Drawings.pdf"107029420"file"".pdf""1""2026-10-14T18:43:22.13+00:00""089ac34f64a645b89666a924e5208f18""public""0""public""c70fe0ab34f9420098ddb31c90ce7d2c""0"25"0""TE-05 Materials Manual of Instruction.pdf"4668146"file"".pdf""1""2026-10-14T18:43:22.13+00:00""b67db9f102d34c3e91ac197db1b8a775""public""0""public""6fa5799ff9aa4abe890f2240c68153f6""0"24"0""TE-06 Min Sampling an Testing.pdf"862520"file"".pdf""1""2026-10-14T18:43:22.13+00:00""ae4228b3d8cb470f9c598cfe8d053bfe""public""0""public""8cac72fc5cad4331881fbabcaa5cf06a""0"23"0""TE-07 Quality Management Plans 5 June 2025.pdf"1976283"file"".pdf""1""2026-10-14T18:43:22.13+00:00""b801fa2dfd734d98b9bcc94f96f73cab""public""0""public""275dc51a93434ab28f08dac8d7da0519""0"22"0""TE-08 Work Zones.pdf"421324"file"".pdf""1""2026-10-14T18:43:22.13+00:00""ca7108e52a4143668b810dd4092277f9""public""0""public""d62b70231b7048ddb201543e71fdef95""0"21"0""TE-09 Dust Control Forms 5 June 2025.pdf"637846"file"".pdf""1""2026-10-14T18:43:22.13+00:00""1500203f3f12425a9da511f94fe31b18""public""0""public""b28781b3badc4eec8dabc17249384902""0"20"0""TE-09a Fugitive Dust Control Form 01-Crushing.pdf"759179"file"".pdf""1""2026-10-14T18:43:22.13+00:00""4f662e745a2245679b8c1789cd6f7d1f""public""0""public""a4bb3616ee0649edbcc0a779af9b30be""0"19"0""TE-09b Fugitive Dust Control Form 02-Screening.pdf"749193"file"".pdf""1""2026-10-14T18:43:22.13+00:00""fb289113099743d195bdf5a2914d8867""public""0""public""3626515cec6341769cf66a9a3f33103a""0"18"0""TE-09c Fugitive Dust Control Form 03-Stockpiles.pdf"781313"file"".pdf""1""2026-10-14T18:43:22.13+00:00""32aca19f5d1648c2b78096041aa4e9c4""public""0""public""54a828ff9abd46f8ab77961d4935d186""0"17"0""TE-09d Fugitive Dust Control Form 04-Hauling.pdf"781926"file"".pdf""1""2026-10-14T18:43:22.13+00:00""f9ebc8f5ab59487f81d4ffc3698e5aed""public""0""public""6ac8ab6f890c4f868dc67ec8fc48668a""0"16"0""TE-09e Fugitive Dust Control Form 05-Staging Areas.pdf"789710"file"".pdf""1""2026-10-14T18:43:22.13+00:00""8400190a47a04345be77317224e62058""public""0""public""37f52e97b117453e92e7c63313040e5f""0"15"0""TE-09f Fugitive Dust Control Form 06-Backfilling.pdf"795835"file"".pdf""1""2026-10-14T18:43:22.13+00:00""d624c079b9fa4e27af5fa38b6e4ba78b""public""0""public""c9522743015d4c12b613e792e18d4fb6""0"14"0""TE-09g Fugitive Dust Control Form 07-Site Preparation.pdf"783046"file"".pdf""1""2026-10-14T18:43:22.13+00:00""81f72e09356b4404afe6fd68644df879""public""0""public""c3f300c2acab4fbdaa5322836fdc137f""0"13"0""TE-09i Fugitive Dust Control Form 09-Site Grading.pdf"784815"file"".pdf""1""2026-10-14T18:43:22.13+00:00""3cc2c952d5a544169708bd56ebc602dd""public""0""public""c060bf32f71b4e299b8500aca1130e70""0"12"0""TE-09j Fugitive Dust Control Form 10-Demolition.pdf"785750"file"".pdf""1""2026-10-14T18:43:22.13+00:00""d12e21dc712f459eb7029aaa5a8e7e13""public""0""public""0f1bb643e6304042b8c5770975363764""0"11"0""TE-09k Fugitive Dust Control Form 11-Disturbed Soil.pdf"767088"file"".pdf""1""2026-10-14T18:43:22.13+00:00""446a10b254454f5fb14f6e7b8ac40175""public""0""public""4bf436c5591f44c681907e9d1e3b464c""0"10"0""TE-09l Fugitive Dust Control Form 12-Disturbed Land.pdf"766196"file"".pdf""1""2026-10-14T18:43:22.13+00:00""a54741e12f024f6cb4b3b8e1a03fbc4f""public""0""public""92fdf89937844fe8847182c1284769d4""0"9"0""TE-09m Fugitive Dust Control Form 13-Sawing-Cutting.pdf"760745"file"".pdf""1""2026-10-14T18:43:22.13+00:00""d0f1a211480549c1b4a93bc20e2deca4""public""0""public""a938d8e251c147a3a85e60a253378e1e""0"8"0""TE-09n Fugitive Dust Control Form 14-Trenching.pdf"781507"file"".pdf""1""2026-10-14T18:43:22.13+00:00""847c5d3906f3456a883563ea2166087a""public""0""public""92a87a74ba61415fae9c2bbd5195eb2c""0"7"0""TE-09o Fugitive Dust Control Form 15-Loading.pdf"776608"file"".pdf""1""2026-10-14T18:43:22.13+00:00""2028c2cec6d743279778996dea6a6f4d""public""0""public""750bd2b8bb00459f9bb49bbddfb6c027""0"6"0""TE-09p Fugitive Dust Control Form 16-Paving.pdf"779523"file"".pdf""1""2026-10-14T18:43:22.13+00:00""9c1d91759f494f26a05b2f9b74600fdb""public""0""public""801d3bf765a94401a9a1e7f94de5be35""0"5"0""TE-09q Fugitive Dust Control Form 17-Trackout.pdf"765463"file"".pdf""1""2026-10-14T18:43:22.13+00:00""c8a7a5886e9a459186130debf735ad48""public""0""public""461fbf0a6c2e432f91e758b432126295""0"4"0""TE-09r Fugitive Dust Control Form 18-Traffic.pdf"781357"file"".pdf""1""2026-10-14T18:43:22.13+00:00""fc8407f9cfe24ccb89dc1201ad352a24""public""0""public""f97706f1417a47a7910c1dc3c4d1eff7""0"3"0""TE-10 Asphalt Slurry Seal.pdf"2105032"file"".pdf""1""2026-10-14T18:43:22.13+00:00""a4177fc2cd0d41f7badd8a4f1f4b0e89""public""0""public""c396429bc3154733acbbd445fd499b83""0"2"0""TE-11 Existing Asphalt Core Sampling FY27 -FY31 Paving 12 March 2026.pdf"255555"file"".pdf""1""2026-10-14T18:43:22.13+00:00""8e4b7fc0ab7d4025b67bf26ba2368adc""public""0""public""21ab5f757528469585d5113543ba1075""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 6f9049fa3ae140c1b5be226842043568), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.