The U.S. Embassy San José, Costa Rica, Bureau of International Narcotics and Law Enforcement Affairs (INL), intends to award one (1) Firm-Fixed-Price construction contract to provide all fabrication, supply, installation, testing, commissioning, integration, quality control, safety oversight, and supervision necessary to deliver a fully operational Wet Scrubber and Recirculation Water System for the industrial incinerator located at OIJ Ciudad Judicial, Heredia, Costa Rica.
The objective of this project is to assist Costa Rican efforts to effectively address transnational crime through provision of equipment, training, expertise, and law enforcement cooperation.
The Contractor shall provide all labor, materials, equipment, fabrication, installation, QA/QC, safety, and supervision necessary to complete the Wet Scrubber and Recirculation Water System at OIJ Ciudad Judicial, delivering a safe, code-compliant, fully commissioned system with complete documentation, and achieve Final Acceptance within sixty (60) calendar days after issuance of the Notice to Proceed (NTP).
The Contractor shall provide all labor, materials, equipment, fabrication, installation, QA/QC, safety, and supervision necessary to complete the Wet Scrubber and Recirculation Water System at OIJ Ciudad Judicial. The scope includes fabrication and supply of a centrifugal Wet Scrubber system, a Water Recirculation and Sedimentation Tank System, a chemical preparation and dosing system for alkaline reagent (excluding the owner-furnished chemical dosing pump), a pH, temperature, and level monitoring and alarm system, removal and disposal of the existing baghouse system, integration with the existing incinerator gas treatment system and owner-furnished recirculation pumps/pump house, and spare parts supply, commissioning, and documentation. The Contractor shall achieve Final Acceptance within sixty (60) calendar days after issuance of the Notice to Proceed (NTP).
We post new metalwork opportunities as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""20520""WASHINGTON""DC""USA""DEPARTMENT OF STATE, 2201 C ST NW""INL Combined Synopsis and Solicitation-PR16088790 - Wet Scrubber for Incinerator.pdf"314722"file"".pdf""1""2026-09-23T20:25:56.368+00:00""782bca63d7ff4e48a3eb8a41fc231bc5""public""0""public""14e40a4e37ee4ff698d096c4caba7edc""0"10"0""Performance Work Statement - PR16088790 -FINAL VERSION.pdf"743255"file"".pdf""1""2026-09-23T20:25:56.368+00:00""55481ebb4dbe4000ad27b12571ed8585""public""0""public""21e5e8f14ae94fdbb9fa221e86ab8bf4""0"9"0""J-7 - PRICING FORMAT - PR16088790 Wet Scrubber Project.xls"881152"file"".xls""1""2026-09-23T20:25:56.368+00:00""337bec655d2d446bb7cf2e952e1c250a""public""0""public""549922e00032471fbfa853cd3abff1c3""0"8"0""J-4 TANQUE DE DOSIFICACION - REFERENCE IMAGE.pdf"284567"file"".pdf""1""2026-09-23T20:25:56.368+00:00""b1b5b26ee394477db717dcb70889cf77""public""0""public""649e2591ffcf456f9d775c84625cee22""0"7"0""J-5 - INLCR-TUBERIAS UBICACIONES.pdf"1141622"file"".pdf""1""2026-09-23T20:25:56.368+00:00""4f901d6c951f442fb2033d1ce4f0d724""public""0""public""e7c6308fc9ef4739b73e68e37def0197""0"6"0""J-6 -SOW Equipment - Attachment Spare Parts List.pdf"97972"file"".pdf""1""2026-09-23T20:25:56.368+00:00""c71fc2ece378462dbaaf4b22972ae11c""public""0""public""6c97430071f742c4be2363b5bf21072f""0"5"0""J-3 - INL-i8-CJSJCR-PLANOS FINALES LAVADOR12052026.pdf"3213400"file"".pdf""1""2026-09-23T20:25:56.368+00:00""255ae0d6f8f94ebf994c83454d2ca79b""public""0""public""1104d44e26aa425a8b9790882a1672c7""0"4"0""J-1 FINAL DESIGN UNIQUE CONTROL SYSTEM AND EQUIPMENT COSTA RICA.pdf"1999255"file"".pdf""1""2026-09-23T20:25:56.368+00:00""a00072961fc6410cb9efac3d310b14a8""public""0""public""59339aef073c459980b25ccc6f494774""0"3"0""J2 - APPENDIX CLARIFICATIONS 1 SYSTEM AND CONTROL EQUIPMENT DESIGN INCINER8 LATAM.pdf"901040"file"".pdf""1""2026-09-23T20:25:56.368+00:00""8f1daa0f4674491db923efbadac45e9f""public""0""public""f0ee7c96e8164a2883f96136ac3ea621""0"2"0""J2 - APPENDIX CLARIFICATIONS 2 SYSTEM AND CONTROL EQUIPMENT DESIGN INCINER8 LATAM.pdf"757511"file"".pdf""1""2026-09-23T20:25:56.368+00:00""2bedace52d5d410d86491ced8feed381""public""0""public""78188a4ac5524848a8603456e2803881""0"1"0"Most public work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 6debe9f2a5524917be01f259d9ad7e51), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.