Presolicitation Notice – WCF Electrical Safety Substation Upgrade Project
Solicitation Number: 2031ZA27R00005
The Bureau of Engraving and Printing (BEP) intends to issue a solicitation for a design-build Electrical Safety Substation Upgrade Project at the Western Currency Facility (WCF), located at 9000 Blue Mound Road, Fort Worth, TX 76131.
The project involves upgrading the existing electrical distribution systems within Substations I, II, III, and IV. The anticipated scope includes the replacement and retrofitting of existing circuit breakers with Schneider Electric MasterPact circuit breakers, installation of associated electrical components, ground fault protection, remote breaker operating capabilities, and energy reduction maintenance settings.
The contractor will also be responsible for integrating the new equipment with existing facility control systems, performing arc flash and electrical coordination studies, conducting required testing and commissioning, and providing updated electrical drawings and documentation.
The contractor shall furnish all necessary design and engineering services, labor, materials, equipment, supervision, and associated resources required to complete the project in accordance with the Statement of Work (SOW), applicable codes, and industry standards.
This acquisition will be conducted as a total set-aside for eligible Service-Disabled Veteran-Owned Small Businesses (SDVOSBs) under NAICS code 238210, Electrical Contractors and Other Wiring Installation Contractors.
Estimated Magnitude of Construction: Between $1,000,000 and $5,000,000.
Anticipated Solicitation Release Date: December 9, 2026
Anticipated Proposal Due Date: January 11, 2027
The solicitation and all applicable attachments will be made available electronically through SAM.gov. Interested contractors are encouraged to monitor SAM.gov for the official solicitation and any subsequent updates.
The project involves upgrading the existing electrical distribution systems within Substations I, II, III, and IV. The anticipated scope includes the replacement and retrofitting of existing circuit breakers with Schneider Electric MasterPact circuit breakers, installation of associated electrical components, ground fault protection, remote breaker operating capabilities, and energy reduction maintenance settings. The contractor will also be responsible for integrating the new equipment with existing facility control systems, performing arc flash and electrical coordination studies, conducting required testing and commissioning, and providing updated electrical drawings and documentation. The contractor shall furnish all necessary design and engineering services, labor, materials, equipment, supervision, and associated resources required to complete the project in accordance with the Statement of Work (SOW), applicable codes, and industry standards.
We post new electrical opportunities in Texas as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""20228""WASHINGTON""DC""USA""14TH&C STREET, SW"Most Texas work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 6cee1ff38c1c42ee9015c146d32ccc52), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.