All inspection reports and amendment are attached.
The contractor shall perform semi-annual, annual, five-year full-load, and ad-hoc inspections of all conveyances listed in Appendices A through C at the Dallas, Garland, and Sam Rayburn (Bonham) VA campuses. The contractor must use TDLR-registered, QEI-certified inspectors. The maintenance contractor will furnish, move, and remove all test weights and perform all test operations at no cost to this contract; the inspection contractor's role is limited to inspecting, witnessing, and reporting. The contractor shall provide documentation to TDLR and to the COR. The contractor's testing scope is limited to Category 1 (annual) tests and Category 5 (five-year full load) tests; Category 3 tests on hydraulic elevators are not within scope.
We post new electrical opportunities in Texas as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""78240""San Antonio""TX""USA""5441 Babcock Road""Suite 302""INSP - VA Dallas September 2025 Packet.pdf"3464986"file"".pdf""1""2026-10-29T15:27:42.375+00:00""3fb7b5b947a74f49b6d1780f30c9c860""public""0""public""fde385a89c10437282450e55d7da6973""0"6"0""INSP - VA Bonham Sept 2025.pdf"1207919"file"".pdf""1""2026-10-29T15:27:42.375+00:00""7f2162d5cb8a4efca98ec1236b5e9852""public""0""public""96a036852ce7424c88933d4a305df042""0"5"0""S06 - 36C25727Q0031 0001 Amendment NTX Elevator Inspection.pdf"310907"file"".pdf""1""2026-10-29T15:27:42.375+00:00""669dc95387f14084b2de34364d9dcc79""public""0""public""cc7c3c87c60b45a89381decc344fa700""0"4"0""INSP - VA Garland September 2025.pdf"646610"file"".pdf""1""2026-10-29T15:27:42.375+00:00""80fd1e556ef14397b8523b7dfc500bd0""public""0""public""ee2ea4ce038e49e4b56556f78c059f70""0"3"0""INSP - VA Garland 2025 OOS.pdf"311380"file"".pdf""1""2026-10-29T15:27:42.375+00:00""2cf40bc4e2454f3c93a35b571d1123f7""public""0""public""c310d58c6bf743539a5fc87c49e5cad8""0"2"0""INSP - Garland Semi- Annual Elev Insp Cover Letter 2025.pdf"392481"file"".pdf""1""2026-10-29T15:27:42.375+00:00""486b3bcdebea4a689de33923996ef1b5""public""0""public""32f5ff8bd394421a95ddd20f66622723""0"1"0"Most Texas work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 6c5ec86e7df64ae9a7f4e0cd007e310b), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.