W9127N27BA005 Foster Spillway Gate Nut Replacements and Re-Tensioning. The U.S. Army Corps of Engineer (USACE) Portland District is soliciting construction firms who are interested in submitting a competitive firm-fixed-price bid for this project. This Solicitation Announcement is for the Foster Spillway Gate Nut Replacements and Re-Tensioning requirement located at Foster Dam, Linn County, Oregon.
See the attached Solicitation, which includes the Specifications, the Plan set, and one FIO Attachment for all details. The scope included in this solicitation requires the contractor and/or subcontractor(s) information system to process, store, or transmit Federal Contract Information (FCI) or Controlled Unclassified Information (CUI), and requires the contractor and/or subcontractor(s) to comply with CMMC requirements. The Contractor shall have and maintain for the duration of this contract, order, or agreement a current CMMC status at the following CMMC level, or higher: CMMC Level 1 (Self) for all information systems used in performance of the contract, task order, or delivery order that process, store, or transmit FCI or CUI.
See DFARS 252.204-7021 Contractor Compliance With the Cybersecurity Maturity Model Certification Level Requirements, for the definitions, requirements, reporting, and subcontract information for this contract/order/agreement. THE GOVERNMENT RESERVES THE RIGHT TO CANCEL THIS SOLICITATION EITHER BEFORE OR AFTER THE RESPONSE DATE AND TIME. NO REIMBURSEMENT WILL BE MADE FOR ANY COSTS ASSOCIATED WITH PROVIDING INFORMATION IN RESPONSE TO THIS SOLICITATION OR ANY FOLLOW-UP INFORMATION REQUESTS.PIEE Solicitation Module Link for W9127N27BA005 at the bottom of this notice for the attachment.
Site Visit: A site visit will occur at 10:00 A.M. Local Time on November 30, 2026. Send an email to Chris Burroughs (christopher.d.burroughs@usace.army.mil) and Justin F. Figueredo (justin.f.figueredo@usace.army.mil) by 1:00 P.M. Local Time on November 25, 2026 with the following information to register for the site visit: Solicitation Number: W9127N27BA005 Project Title: FOSTER SPILLWAY GATE NUT REPLACEMENT AND RE-TENSIONING. Name(s) of individual(s) attending site visit: Name of Company: Phone Number: Email Address: Participants of the scheduled site visit must abide by the U.S. Army Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1, latest version) in accordance with Section 5, Personal Protective and Safety Equipment.
It is the responsibility of the participants to wear personal protective and safety equipment as required by this regulation. Failure to comply could result in denial of access to site visit location. Site visit attendees must be U.S. citizens and possess a REAL ID to access the site(s).
Acceptable forms of proof of citizenship for anyone born outside the USA is: 1. US Birth Certificate: Must be certified and issued by either a US State or the US State Department. 2.
US Passport Undamaged: Issued by the US Dept of State, without limitation, does not need to be current, is/was valid for 10 years for adults and 5 years for children under 16. 3. US Passport Card Undamaged: Issued by the US Dept of State, without limitation, does not need to be current.
Consular Report of Birth Abroad: Issued by the US State Department. 6. US Naturalization Certificate: Issued by US Citizenship and Immigration Service.
Real ID drivers license 2. Enhanced drivers license 3. Federal Identification Cards PIC/CAC/PIV/Etc.
Driver license issued by the Department of State
We post new metalwork opportunities in Oregon as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"97204-3495""PORTLAND""OR""USA""KO CONTRACTING DIVISION""333 SW FIRST AVE""https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W9127N27BA005¬iceType=SolicitationNotice"0"link""1""2026-11-16T21:58:17.917+00:00""7a833f51b8f84113bdd0038d37165d72""public""0""PIEE Solicitation Module Link for W9127N27BA005""public""91d7adf1130b4337a61f811beee73cd0""0"4"0""https://piee.eb.mil/wbt/xhtml/wbt/sol/index.xhtml"0"link""1""2026-11-16T21:58:17.917+00:00""43a4a482c5124baab1b162cfc164dc5b""public""0""Web Based Training for the PIEE Solicitation Module""public""ae7526166cc9404ea26f0dedb2ce7eab""0"3"0""https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf"0"link""1""2026-11-16T21:58:17.917+00:00""6aed601224064bdaa993e0f2ef95c0ff""public""0""Registration Instructions for the PIEE Solicitation Module""public""d345f2a503a243dc90a8d40120739443""0"2"0""https://toolbox-piee.eb.mil/"0"link""1""2026-11-16T21:58:17.917+00:00""5d766701a2d740ae83154d46253411be""public""0""Department of Defense Procurement Toolbox""public""dd113352959f4276abb73dc7e8bc5496""0"1"0"Most Oregon work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 6b75519d71e24db4bbb34e456384a9a3), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.