Cross Connection Hazard Assessment for DLA Distribution San Joaquin, CA
***** Amendment 0001 *****
***** Amendment 0002 *****
The contractor shall provide all personnel, equipment, tools, materials, supervision, and other items and non-personal services necessary to perform an Initial Cross-Connection Hazard Assessment. The work includes a comprehensive site survey of the DDJC potable water system encompassing a single groundwater source, on-site pumping and treatment facilities, an elevated potable-water storage tank, a campus-wide distribution system, and the interior and exterior of all 43 served buildings. The contractor must identify and classify all existing or potential cross-connections, evaluate the condition and adequacy of existing backflow prevention devices, and recommend corrective actions. Deliverables include a Cross-Connection Inventory Database, a Draft Assessment Report, and a Final Assessment Report.
We post new uncategorized opportunities in California as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"17070-5008""NEW CUMBERLAND""PA""USA""ACQUISITION OPERATIONS (J7)""430 MIFFLIN AVENUE SUITE 3102A""SP3300-27-Q-0011 - Amendment 0002.docx"40696"file"".docx""1""2026-11-25T16:19:02.614+00:00""52a60e9889fa483a95b891e2b0342488""public""0""public""0bc3bd15de094ba9a7ff0da647d752ea""0"9"0""SP330027Q0011 - Amendment 0001.pdf"243776"file"".pdf""1""2026-11-16T18:42:02.227+00:00""024fd904cbc44709b5a2aae00816f38d""public""0""public""0989cd186fd34dcd8bef9332ccf5a76f""0"8"0""SP3300-27-Q-0011 - Amendment 0001.docx"47913"file"".docx""1""2026-11-16T18:42:02.227+00:00""791a627afa1940e69d1c62d8092ae2ef""public""0""public""b3e09f2c145f4fc9ba5228e05a2e7296""0"7"0""Attachment 4 - Deliverables Schedule.docx"14715"file"".docx""1""2026-11-16T18:42:02.227+00:00""fa986f8e4db54e4b8bded163f9a5ee93""public""0""public""5f8f5a1b71104465a1b7151cc3f8dc10""0"6"0""Attachment 3 - Wage Determination 2015-5653.pdf"69804"file"".pdf""1""2026-11-16T18:42:02.227+00:00""9ef0e52233f94542a7442446d3c510c1""public""0""public""4157ce84db404df2934b768b8df3bbf0""0"5"0""Attachment 2 - Performance Work Statement.docx"18638"file"".docx""1""2026-11-16T18:42:02.227+00:00""52d75086e02b4c7b8532279825ea1abb""public""0""public""b67ab020d1a4472cbb51cbdb30a2b70b""0"4"0""Attachment 1 - Schedule of Supplies or Services and Prices.xlsx"15617"file"".xlsx""1""2026-11-16T18:42:02.227+00:00""a4ed4dd6cce94ccf990c0b8907658bb6""public""0""public""aad65570d8c4425ba71b8fdfc8ee7572""0"3"0""SP330027Q0011.pdf"78384"file"".pdf""1""2026-11-06T17:15:08.405+00:00""9b8a6723e8c74dcc82371d6d991e28ca""public""0""public""d383456784194d19a96c40410a454e57""0"1"0"Most California work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 6ab99d84b1b247cb8f2a81b0cda0b296), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.