This requirement is for two air compressor relocations for US Naval Research Laboratory (NRL). The full description and response requirements are included in the Request for Quotes (RFQ) N0017326Q1905 along with attachments. Your quick response is appreciated to facilitate an award prior to current fiscal year end.
A site visit is required before submitting any proposal or quote. The mandatory site visit is scheduled for Wednesday, October 7, at 9:30 am EDT at NRL. All visitors must notify NRL Contracts at least 2 days prior to the scheduled visit. If you are unable to attend on this date, another date may be requested, although the requested date/time may not be available. No change to the response date and time specified in Block 8 of the Standard Form (SF) 1449 will be granted based on an inability to visit NRL on the planned site visit day. Your quick response is appreciated to facilitate an award prior to current fiscal year end.
Amendment N0017326Q19050001 provides photos of the air compressors data plate information.
Amendment N0017326Q19050002 includes an additional site visit and extends RFQ response date.
Amendment N0017326Q19050003 removes the small business set aside, includes a site visit and extends RFQ response date.
Amendment N0017326Q19050004 provides additional photos, drawings, Government responses to questions received, and extends RFQ response date.
Amendment N0017326Q19050005 provides Government response to an additional question received.
Amendment N0017326Q19050006 extends RFQ response date to 11/04/2026 @ 2:00pm EST.
The contractor shall relocate two existing air compressors from mechanical room 026B in NRL Building 65 to a new outside metal shed. Work includes providing a pre-engineered metal building on an 8-inch concrete slab (4,000 PSI, with 1/2-inch rebar at 12-inch OC), extending 3-inch copper compressed air piping (matching existing 2-inch field size), extending 480V power with a heavy duty disconnect switch, extending Siemens BAS wiring in rigid galvanized conduit, providing a new 208V/120V panelboard in the shed, installing a 13,300 CFM exhaust fan, electric unit heater, LED lighting, fire alarm system tied into Building 65, and interior insulation. The contractor must keep one compressor operational at all times, limit outages to weekends with 30-day advance notice, provide a construction-phasing plan, and restore all wall penetrations (minimum 2-hour firestopping) to match original conditions. The contractor is responsible for all design disciplines (structural, mechanical, electrical, civil, architectural) and must submit shop drawings for Government approval prior to construction. Asbestos and lead testing is required; remediation if needed will be handled via modification. The period of performance begins upon award, with delivery required by 04 Dec 2026.
We post new plumbing opportunities in Washington, DC as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"20375-5328""WASHINGTON""DC""USA""4555 OVERLOOK AVE SW""Solicitation Amendment N0017326Q19050006 SF 30.pdf"102854"file"".pdf""1""2026-10-28T18:18:39.432+00:00""4b42271cdb694c4e9c183dcf1dd1b980""public""0""public""71ffa1c87a4c4515b574cbc2d6b789f7""0"15"0""Solicitation Amendment N0017326Q19050005 SF 30.pdf"630441"file"".pdf""1""2026-10-23T12:43:34.1+00:00""3f80e174600f4ebfb81454e376bfd751""public""0""public""616dc3a5359d46efa2037a7a7705b707""0"14"0""Solicitation Amendment N0017326Q19050004 SF 30.pdf"661420"file"".pdf""1""2026-10-15T11:47:03.73+00:00""22164c3d14764eb7a27616fc91c3f85c""public""0""public""030347d4f3a54ad5a2131999813ce882""0"13"0""Attachment3_N0017326Q1905_Additional Photos.pdf"27135953"file"".pdf""1""2026-10-15T11:47:03.73+00:00""aca70624c2804d60aef2a9baab91036d""public""0""public""55f32525a5d144f08fcf9764faebe07a""0"12"0""Attachment4_N0017326Q1905_P275_NRL_Electrical_2025-02-25.pdf"131459131"file"".pdf""1""2026-10-15T11:47:03.73+00:00""06025ddc4e214981893d197b44e5f552""public""0""public""18055458aea145d7b9e5b7ad562c9303""0"11"0""Attachment5_N0017326Q1905_P275_NRL_Fire_Pro_025-02-25.pdf"19349793"file"".pdf""1""2026-10-15T11:47:03.73+00:00""6f64753ee3764992bf951b9c7547bfbf""public""0""public""b7887fb3598a45b9b4186daec9106941""0"10"0""Attachment6_N0017326Q1905_P275_NRL_Mechanical_2025-02-25.pdf"96194803"file"".pdf""1""2026-10-15T11:47:03.73+00:00""871336782e0947c69d45c7a5a43fd235""public""0""public""6e7a2283964647f28b62b0e37d46893f""0"9"0""Attachment7_N0017326Q1905_P275_NRL_Plumbing_2025-02-25.pdf"26086773"file"".pdf""1""2026-10-15T11:47:03.73+00:00""8a16bd04eb454612b46f66d5cc333ea5""public""0""public""a5750f57d4954a3ca2eb22aedd9bc50e""0"8"0""Solicitation Amendment N0017326Q19050003 SF 30 (1).pdf"581624"file"".pdf""1""2026-09-30T16:32:48.969+00:00""48f509a6b3d743fe8a3ac3fb652199c8""public""0""public""d748c3f63fce4ab183731c1eff2a291d""0"7"0""Solicitation Amendment N0017326Q19050002 SF 30.pdf"631968"file"".pdf""1""2026-09-22T19:25:39.797+00:00""6f6a69f5b9bb4c27971ad95596471a5d""public""0""public""85078dc43c1e4c729b847b0b7305ea60""0"6"0""Solicitation Amendment N0017326Q19050001 SF 30.pdf"638661"file"".pdf""1""2026-09-18T14:59:27.566+00:00""0dcdd350177d4d57b6c29d4d3305073e""public""0""public""b6f21758d9b14e2fa10e24947d821dad""0"5"0""Air Compressor Data Plates.pdf"4671292"file"".pdf""1""2026-09-18T14:59:27.566+00:00""c8f0f93dd09e4a598f90fd758a3f6c66""public""0""public""0189a0a77ae347ee8409261580f5f4d8""0"4"0""Solicitation - N0017326Q1905.pdf"1835001"file"".pdf""1""2026-09-14T13:09:18.869+00:00""1bf366f7bf7d4042ababc09dc13aaf50""public""0""public""32153eb477e4458ab671abd5a75d091c""0"3"0""Attachment1_N0017326Q1905_B65 Air Compressor Relocation_SOW.pdf"260023"file"".pdf""1""2026-09-14T13:09:18.869+00:00""b56ceed54ed54b42846032cf342c3f27""public""0""public""a67e3c4bd0204284ab9f18943aeb2ae2""0"2"0""Attachment2_N0017326Q1905_Conceptual drawing_schematics_photos.pdf"6869923"file"".pdf""1""2026-09-14T13:09:18.869+00:00""d13cd6ee519a4cae849d302421932088""public""0""public""928ac6d0064144ae82d98db5476bc663""0"1"0"Most Washington, DC work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 69f57331e2064262bfdd62f346a91752), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.