Please furnish quotation to supply the materials and/or services indicated on page two (2), review the applicable documentation, and return any required documents to jmangis@anl.gov.
Any inquiries are to be directed to Jazlyn Mangis, (630) 252-6884, jmangis@anl.gov
Applicable Documentation:
Appendix "A", Terms and Conditions for Labor Hour and Time and Materials Contracts, ANL-528, dated September 18, 2026. Review and Accept
Appendix “B” Argonne Statement of Work, SOW, dated October 6, 2026. Review
Appendix “C” Price Schedule, dated October 6, 2026. Complete and Return
Low Risk On-Site Supplemental Conditions, ANL-366L, dated October 1, 2024. Review and Accept
Pre-Award Information, Representations and Certifications, ANL-70A, dated March 26, 2025. Complete and Return
The attached RFP/RFQ and only Argonne Terms and Conditions will govern any resultant order.
Proposal will be considered incomplete if any of the requested information, listed below, is not provided.
Provide the following with your quotation:
Signed Page one of the RFQ (ANL-70).
Completed Representations and Certifications (ANL-70A).
Provide a published price list or a redacted invoice showing pricing for the quoted, to prove price reasonableness.
Will you accept Pre-Pay and Add Shipping Charges to Invoice (FOB Destination for Domestic or DAP Destination for International )?
If any tariff charges will be applied to this order, the charge must be included in the unit price on the quote. We are unabl e to accept a tariff charge as a separate line item, as the Department of Energy considers this an unallowable cost.
Are there any available discounts for DOE or does this order fall under GSA contract pricing (if yes, please include contract # and expiration date)?
The Contractor shall partner with designated CMS-CS points of contact to maintain shop inventory, source difficult-to-find materials, and provide outside manufacturing services. Tasks include performing periodic on-site inventory assessments of specialty tooling in Building 363 and satellite locations; supplying standard and specialty tooling on an as-needed basis (end mills, drills, taps, reamers, tool cutters, metric tooling, inserts, collets, tool holders, work-holding fixtures, precision measuring instruments, abrasives); sourcing and delivering specialized, non-standard, or hard-to-find grades of raw materials; and providing specialized manufacturing and finishing services such as tool sharpening and reconditioning, precision calibration, plating, anodizing, painting, specialty surface treatments, and custom/specialty secondary manufacturing. The Contractor must respond to requests via 'Specific Call Records' and submit a written quote within two business days. All physical deliverables shall be shipped/delivered to Argonne National Laboratory, Custom Manufacturing Solutions – Central Shops (CMS-CS), Building 363, 9700 S. Cass Avenue, Lemont, IL 60439.
We post new goods & materials opportunities in Illinois as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"Richland""WA""US""2345 Stevens Drive""60439""Lemont""IL""USA""9700 S. Cass Ave""ANL-70 Request for Quotation 7-B187-Q-00005-00.pdf"241602"file"".pdf""1""2026-10-06T16:16:38.23+00:00""0aef06e39d6b41469f8282fea6186493""public""0""public""04563069f9934c18977f5cd9569e86b2""0"6"0""Appendix A-Labor Hour-18-SEP-2026.pdf"1051472"file"".pdf""1""2026-10-06T16:16:38.23+00:00""39bfd38fb5b04a52a4dfdeb3dcd8cb2a""public""0""public""e587e05bca154634a5cfdde613004093""0"5"0""Appendix B-SOW_TM Specialty Tooling.pdf"163591"file"".pdf""1""2026-10-06T16:16:38.23+00:00""0ec1be0a9eae40b19849d7e82ca9eea3""public""0""public""4b67479f033546ae9ec8e0c0cacf48f0""0"4"0""Appendix C-Price Schedule_TM Specialty Tooling.pdf"138647"file"".pdf""1""2026-10-06T16:16:38.23+00:00""5b55f165ac8e40f5a751ddd2a047cbb7""public""0""public""f624372d223646ae9f5dda0114633d10""0"3"0""ANL-366L (On-Site Low Risk)-01-OCT-2024.pdf"293223"file"".pdf""1""2026-10-06T16:16:38.23+00:00""15663b81fb554c34acd21a290cc5ad68""public""0""public""9545610a584b4ff282207d8b4f90feef""0"2"0""ANL-70A Reps and Certs Short-26-MAR-2025.pdf"432794"file"".pdf""1""2026-10-06T16:16:38.23+00:00""f61dcb905a564a8ba83b9521447235b4""public""0""public""7ea59202c24f429b89af4b63209f20cb""0"1"0"Most Illinois work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what an agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 69499c33fa9447708706019203eabcf4), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.