THIS IS NOT A REQUEST FOR PROPOSALS. NO PROPOSALS ARE TO BE SUBMITTED IN RESPONSE TO THIS NOTICE.
The National Aeronautics and Space Administration (NASA) Ames Research Center (ARC) plans to issue a Request for Proposal (RFP) for the complete replacement of two model support systems of its Unitary Plan Wind Tunnel (UPWT). The support systems require piece parts which need complicated machining and exacting tolerances. The largest and most complex parts (up to 99" long, 15.5" diameter, 1400 lbs) are to be made from the American Society for Testing and Materials (ASTM) A668 forgings. Some parts require precision grinding of bearing race lands to .0005” to .001” roundness and cylindricity. Contractor will be responsible for procuring forgings, material certifications, machining, grinding, heat treating, inspection reports, and shipping to NASA ARC. Final assembly will be done at NASA ARC by the tunnel mechanics, but interim fit checks of the mating parts could be done by the contractor as the work progresses. Each complete model support system requires over 122 parts.
The Government does not intend to acquire a commercial product or commercial service using FAR Part 12.
This acquisition is for a total small business set-aside.
The NAICS Code and Size Standard are 332710 and 500 employees, respectively.
The anticipated release date of the RFP is on or about December 8, 2026, with an anticipated offer due date of January 8, 2027.
All responsible sources may submit an offer which will be considered by the agency.
NASA Clause 1852.215-84, Ombudsman, is applicable. The Center Ombudsman for this acquisition can be found at: https://www.hq.nasa.gov/office/procurement/regs/Procurement-Ombuds-Comp-Advocate-Listing.pdf
If a solicitation is released, then it and any additional documents will be available on Sam.gov.
It is the offeror's responsibility to monitor this website for the release of the solicitation and amendments (if any). Potential offerors will be responsible for downloading their own copy of the solicitation and amendments (if any).
Prospective offerors are encouraged to notify this office of their intent to submit an offer. All contractual and technical questions must be submitted electronically via email to Wilma Estrada and Wilma.L.Estrada@nasa.gov not later than December 22, 2026 5:00 p.m. Pacific time. Telephone questions will not be accepted.
The contractor will be responsible for procuring forgings, material certifications, machining, grinding, heat treating, inspection reports, and shipping to NASA ARC. The largest and most complex parts (up to 99" long, 15.5" diameter, 1400 lbs) are to be made from ASTM A668 forgings. Some parts require precision grinding of bearing race lands to .0005” to .001” roundness and cylindricity. Final assembly will be done at NASA ARC by the tunnel mechanics, but interim fit checks of the mating parts could be done by the contractor as the work progresses. Each complete model support system requires over 122 parts.
We post new goods & materials opportunities in California as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""94035""MOFFETT FIELD""CA""USA""MOFFETT FIELD CA 94035"Most California work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what an agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 67839b53cd9f4edf8a142856e6ee7a27), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.