Light RFP
Federal · SAM.gov · Paradise Hill, OK

15kV Switchgear & Station Service Replacement at Lake Tenkiller, OK

Open — see notice·Electrical, Demolition / Abatement, Bridge / InfrastructureView official posting ↗
Issuing agency
Department of Defense
Method
Presolicitation
Category
Construction · NAICS 238210
PIN
W912BV26RA032
Location
Paradise Hill, OK
Posted
Jul 6, 2026
Takeaways by LightRFP AI
  • This is a pre-solicitation notice for a 15kV Switchgear & Station Service Replacement at Lake Tenkiller, Oklahoma, issued by the U.S. Army Corps of Engineers – Tulsa District.
  • The estimated magnitude of construction is between $5,000,000 and $10,000,000.
  • The estimated duration of construction is 900 calendar days.
  • Anticipated solicitation issuance date is on or about 20 July 2026, and the estimated proposal due date will be on or about 19 August 2026.
  • The procurement method is design-bid-build, solicited as a Small Business Set-Aside firm-fixed price contract.
  • Place of performance is Paradise Hill, OK.
  • The NAICS code is 238210, Electrical Contractors and Other Wiring Installation Contractors, with a small business size standard of $19M.
  • Requirement: Small Business Set-Aside.

AI-generated, verify all details against the official documents.

Description

Pre-solicitation Notice

For

15kV Switchgear & Station Service Replacement

at Lake Tenkiller, OK

This is a PRE-SOLICITATION NOTICE for the construction of a 15kV Switchgear & Station Service Replacement at Lake Tenkiller, in Oklahoma. **TH****IS IS NOT A SOLICITATION FOR PROPOSALS AND NO CONTRACT WILL BE AWARDED FROM THIS SYNOPSIS. ** No reimbursement will be made for any costs associated with providing information in response to this pre-solicitation notice or any follow up postings.

The U.S. Army Corps of Engineers – Tulsa District has been tasked to solicit for and award a contract to perform the 15kV Switchgear & Station Service Replacement at Lake Tenkiller, Oklahoma. The proposed design-bid-build project will be procured as a Small Business Set-Aside, firm-fixed price contract in accordance with Revolutionary FAR Overhaul (RFO) Part 15, Negotiated Procurement, using the Lowest Price Technically Acceptable approach. Tradeoffs will not be permitted.

Project Description:

The work includes Replace the three existing 15kV switchgear lineups for the generator breakers and station service transformer feeder breakers.

  • Removal of existing 500 kVA, 13.8 kV/480V station service transformer

  • Removal of existing 15 kV switchgear and breakers located beneath control room

  • Removal of 480V station service switchgear in control room

  • Removal of the existing 15kV cables to the switchyard

  • Removal of existing potheads for the 15kV cable transition to switchyard bus

  • Removal of the existing asbestos cable trays containing 15kV cables in cable tunnel

  • Installation of new 15kV cables to the switchyard

  • Installation of new potheads for the 15kV cable transition to switchyard bus

  • Installation of new cable trays containing the new 15kV cables in cable tunnel

  • Installation of front accessible double-ended 480V switchgear beneath control room with feeder

circuit breakers

  • Installation of 15kV switchgear with new vacuum circuit breakers and redundant 500 kVA

13.8kV/480V, high-resistance grounded wye station service transformers

  • Reconfiguration of project diesel generator to wye-grounded with high-resistance grounding

resistor.

  • New control and annunciation wiring for new 480V and 15kV switchgear where existing cables

are not reused.

  • Modifications to protective relay settings and new protection relays for the new station service

feeders.

  • Automatic transfer functionality for the 480V switchgear main & tie breakers, along with local arc

flash mitigation switches.

  • Replacement and relocation of existing Lighting Transformer

The estimated magnitude of construction for this project is between $5,000,000 and $10,000,000.

The North American Industrial Classification System (NAICS) Code for this procurement is 238210, Electrical Contractors and Other Wiring Installation Contractors, which has a small business size standard of $19M.

The Product Service Code is: Y1NZ (Construction of Other Utilities)

Estimated duration of construction of this project is 900 calendar days.

Anticipated solicitation issuance date is on or about 20 July 2026, and the estimated proposal due date will be on or about 19 August 2026.

Contact

Name
Tyler Godwin
Phone
(918) 669-7281
Address
Paradise Hill, OK
Full source recordfrom SAM.gov
Type
Presolicitation
Title
15kV Switchgear & Station Service Replacement at Lake Tenkiller, OK
Active
Yes
Detail
Type
p
Naics
Code
238210
Type
primary
Title
15kV Switchgear & Station Service Replacement at Lake Tenkiller, OK
Archive
Date
Jul 20, 2026
Type
autocustom
Version
2
Permissions
IVL
Read
Yes
Create
Yes
Delete
Yes
Update
Yes
Solicitation
Set Aside
SBA
Organization Id
100221322
Point Of Contact
Type
primary
Email
tyler.l.godwin@usace.army.mil
Phone
9186697281
Full Name
Tyler Godwin
Type
secondary
Email
dario.m.rissone@usace.army.mil
Phone
9186697109
Full Name
Dario Rissone
Classification Code
Y1NZ
Place Of Performance
City
Code
57150
Name
Paradise Hill
State
Code
OK
Name
Oklahoma
Country
Code
USA
Name
UNITED STATES
Solicitation Number
W912BV26RA032
Additional Reporting
none
History
History
Index
6
Title
15kV Switchgear & Station Service Replacement at Lake Tenkiller, OK
Latest
1
Deleted
0
Action Date
2026-07-21T03:55:46.873987+00
Action Type
publish
Posted Date
2026-07-06T21:23:34.472+00
Request Type
submit
Cancel Notice
0
Archive Notice
1
Opportunity Id
630ba2e721314e859bd60380d335a32f
Procurement Type
p
Solicitation Number
W912BV26RA032
Related Opportunity Id
fc07f25c548d4fd0806083693005097f
Index
3
Title
15kV Switchgear & Station Service Replacement at Lake Tenkiller, OK
Latest
1
Deleted
0
Action Date
2026-04-08T03:55:47.016937+00
Action Type
publish
Posted Date
2026-03-06T22:13:44.018+00
Request Type
submit
Cancel Notice
0
Archive Notice
1
Opportunity Id
fc07f25c548d4fd0806083693005097f
Procurement Type
r
Solicitation Number
W912BV26SS04
Base Type
Presolicitation
Notice Id
630ba2e721314e859bd60380d335a32f
Naics Code
238210
Department
DEPARTMENT OF DEFENSE
Posted Date
Jul 6, 2026
Categorized By
llm
Detail Fetched
Yes
History Fetched
Yes
Point Of Contact
Type
primary
Email
tyler.l.godwin@usace.army.mil
Phone
9186697281
Full Name
Tyler Godwin
Type
secondary
Email
dario.m.rissone@usace.army.mil
Phone
9186697109
Full Name
Dario Rissone
Description Text
**Pre-solicitation Notice** **For** **15kV Switchgear & Station Service Replacement** **at Lake Tenkiller, OK** **This is a PRE-SOLICITATION NOTICE** for the construction of a 15kV Switchgear & Station Service Replacement at Lake Tenkiller, in Oklahoma. **TH****IS IS NOT A SOLICITATION FOR PROPOSALS AND NO CONTRACT WILL BE AWARDED FROM THIS SYNOPSIS. ** No reimbursement will be made for any costs associated with providing information in response to this pre-solicitation notice or any follow up postings. The U.S. Army Corps of Engineers – Tulsa District has been tasked to solicit for and award a contract to perform the 15kV Switchgear & Station Service Replacement at Lake Tenkiller, Oklahoma. The proposed design-bid-build project will be procured as a Small Business Set-Aside, firm-fixed price contract in accordance with Revolutionary FAR Overhaul (RFO) Part 15, Negotiated Procurement, using the Lowest Price Technically Acceptable approach. Tradeoffs will not be permitted. Project Description: The work includes Replace the three existing 15kV switchgear lineups for the generator breakers and station service transformer feeder breakers. - Removal of existing 500 kVA, 13.8 kV/480V station service transformer - Removal of existing 15 kV switchgear and breakers located beneath control room - Removal of 480V station service switchgear in control room - Removal of the existing 15kV cables to the switchyard - Removal of existing potheads for the 15kV cable transition to switchyard bus - Removal of the existing asbestos cable trays containing 15kV cables in cable tunnel - Installation of new 15kV cables to the switchyard - Installation of new potheads for the 15kV cable transition to switchyard bus - Installation of new cable trays containing the new 15kV cables in cable tunnel - Installation of front accessible double-ended 480V switchgear beneath control room with feeder circuit breakers - Installation of 15kV switchgear with new vacuum circuit breakers and redundant 500 kVA 13.8kV/480V, high-resistance grounded wye station service transformers - Reconfiguration of project diesel generator to wye-grounded with high-resistance grounding resistor. - New control and annunciation wiring for new 480V and 15kV switchgear where existing cables are not reused. - Modifications to protective relay settings and new protection relays for the new station service feeders. - Automatic transfer functionality for the 480V switchgear main & tie breakers, along with local arc flash mitigation switches. - Replacement and relocation of existing Lighting Transformer The estimated magnitude of construction for this project is between $5,000,000 and $10,000,000. The North American Industrial Classification System (NAICS) Code for this procurement is 238210, Electrical Contractors and Other Wiring Installation Contractors, which has a small business size standard of $19M. The Product Service Code is: Y1NZ (Construction of Other Utilities) Estimated duration of construction of this project is 900 calendar days. Anticipated solicitation issuance date is on or about 20 July 2026, and the estimated proposal due date will be on or about 19 August 2026.
Resources Fetched
Yes
Full Parent Path Name
DEPARTMENT OF DEFENSE.DEPARTMENT OF THE ARMY.USACE.SWD.W076 ENDIST TULSA
Place Of Performance
City
Code
57150
Name
Paradise Hill
State
Code
OK
Name
Oklahoma
Country
Code
USA
Name
UNITED STATES
Solicitation Number
W912BV26RA032

Source: SAM.gov (notice 630ba2e721314e859bd60380d335a32f), retrieved via the SAM.gov Get Opportunities API. View the official posting — always confirm requirements and deadlines with the issuing agency.