This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Quotations are being requested and a separate written solicitation will not be issued.
Solicitation number 127EAX26Q0103 is issued as a Request for Quotation (RFQ) for I Field Project
IAW Attachment 1 - Statement of Work, The Northern Great Plains Agricultural Research Laboratory (NGPRL), has a requirement of:
INSTALLING NEW BARBED-WIRE FENCE, POSTS, GATES. INSTALLING NEW ELECTRICAL SERVICE LINE WITH OUTLETS AND SET UP. INSTALLING APROXIMATELY 1,475 FT OF UNDERGROUND 1” POLYETHYLENE WATER SUPPLY PIPE WITH ALL THE ASSOCIATED VALVES, DRAINBACKS, AND HARDWARE. INCLUDING 1 – 1INCH FROST FREE 8FT HYDRANT AND 1 DOUBLEBOWL THERMOSINK STOCK WATER FOUNTAIN WITH ALL THE ASSOCIATED HARDWARE AT THE USDA-ARS NGPRL AT SITE.
This acquisition is set-aside for small business concerns. The applicable North American Industry Classification Standard Code is 238990. The small business size standard is $19M. This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quotation which will be considered by the agency.
The contractor shall furnish all skilled labor, materials, equipment, tools, transportation, and supervision necessary to install new barbed-wire fence (Red Brand 12 ½ gauge), steel T-posts, green treated wooden posts, H-braces, gates, and corners; install new electrical service line with 100-amp panels, junction boxes, and 120V 20-amp GFCI outlets at two sites, including trenching and burying approximately 1,450 ft of underground direct burial wire; install approximately 1,475 ft of underground 1-inch polyethylene water supply pipe with all associated valves, drainbacks, hardware, one 1-inch frost-free 8ft yard hydrant, and one double-bowl Thermosink stock water fountain. The contractor must coordinate with Mor Gran Sou electric company for new electrical service and with Missouri West Water for new water service. The work includes clearing trees/brush, utility locates, backfilling, landscaping, and site cleanup. The performance period is 90 calendar days from notice to proceed.
We post new electrical opportunities in North Dakota as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""US""871023498""Albuquerque""NM""USA""333 Broadway BLVD SE""127EAX26Q0103 QA1.docx"15874"file"".docx""1""2026-09-09T22:26:54.804+00:00""556303a398a0436ea0f3ad42409c9842""public""0""public""72ae38406d47433b96e7f629e2df0879""0"4"0""Attachment 1 - Statement of Work.docx"1443693"file"".docx""1""2026-09-03T22:12:32.463+00:00""e382bfc4008a4c8bb2a07ba557c3f817""public""0""public""78d56f6ff84b4641a78749fde09edd9d""0"3"0""127EAX26Q0103.pdf"296658"file"".pdf""1""2026-09-03T22:12:32.463+00:00""d33a7141888140caabc1ab4220e9b8b6""public""0""public""93fe144cbb744b5fa773c5504e127b81""0"2"0""Attachment 2 - Wage Determination.pdf"198237"file"".pdf""1""2026-09-03T22:12:32.463+00:00""fe270c886f5046ed99b25932d2c2bae2""public""0""public""a89c19afcda84d4a94745e7f9ece5724""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
Source: SAM.gov (notice 17f4f0462d1b4d0b810a0b6ec0c4158c), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.