RFQ extended to Friday, 11/27/26, at 4:00 pm CT
SAM will not allow me to attach the spt file here. It is available upon request.
PLEASE INCLUDE THE FOLLOWING IN YOUR BID:
• CAGE/UEI CODE
• FOB DESTINATION
• LEAD TIME FOR DELIVERY
• POC NAME & EMAIL
Questions must be sent no later than day 3 of the posting.
** SEE THE ATTACHMENTS **
We will not be paying with a credit card
VENDORS MUST REFERENCE THE RFQ NOTICE ID NUMBER IN THE SUBJECT LINE OF YOUR EMAIL WHEN SUBMITTING A QUOTE
The contractor must develop a mass production process, demonstrating a qualified, repeatable, high-throughput industrial production process. The delivered parts are the evidence by which that process is characterized. The work includes design, tooling, qualification lot, and scalability report phases. The contractor may subcontract the production press line and tooling fabrication to a qualified domestic metal stamping or tool and die partner, while leading process development, design, and qualification. The key characteristics to be considered include the eight holes on center with the part diagonals (two per corner). Offerors are expected to state conventional tolerance and repeatability for their proposed production process, with qualification of the measurement system for the key characteristics with a Gage Repeatability and Reproducibility (GR&R) study, using the ANOVA method per the AIAG MSA Reference Manual, with total GR&R not exceeding 10% of the key characteristic tolerance. NASA may accept values above 10% and up to 30% with documented rationale. Delivery is FOB Destination.
We post new uncategorized opportunities in Mississippi as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""39529""STENNIS SPACE CENTER""MS""USA""JERRY HLASS ROAD, BLDG. 1111""SATPC0043200 Tab 10 6 Questions.pdf"39608"file"".pdf""1""2026-11-18T13:02:06.723+00:00""9c86d52742114179a4acdd403c147be9""public""0""public""cbd75039443543a4bd6cfe6d9aaa5abb""0"3"0""SATPC0043200 Tab 10 1 SOW.pdf"1712856"file"".pdf""1""2026-11-16T19:35:19.974+00:00""18578d05d7524659ab6e4a8281c36915""public""0""public""18b3353790f941ea902f597bdfd2ae15""0"2"0""SATPC0043200 Tab 10 3 RFQ Open Market.pdf"415307"file"".pdf""1""2026-11-16T19:35:19.974+00:00""e655d22e4b1b4257a1ca90e0634713da""public""0""public""36fe270c948a43269d778b3ddf11253e""0"1"0"Most Mississippi work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 62be765a534c4eff8f878018b9d3da5b), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.