Perform surveying, dredging and disposal of approximately 900,000 cubic yards of fine-grained shoaled material annually for three (3) years at the Anchorage Harbor with an option to annually dredge 350,000 cubic yards of sandy material with some cobbles in Cook Inlet Navigation Channel. The dredging must be accomplished in a manner that keeps the Port of Alaska dock face and terminals accessible for shipping traffic at all times. The Cook Inlet Navigation Channel, which is the marked entrance through Knik Arm Shoal to Anchorage Harbor, may also require periodic maintenance dredging.
The contractor is to furnish all labor, equipment, supplies, materials, supervision and other items and services necessary to accomplish the work. Amendment 0001 published 24 Nov 2026.
Perform surveying, dredging and disposal of approximately 900,000 cubic yards of fine-grained shoaled material annually for three years at Anchorage Harbor, with an option to annually dredge 350,000 cubic yards of sandy material with some cobbles in the Cook Inlet Navigation Channel, the marked entrance through Knik Arm Shoal to Anchorage Harbor; dredging must keep the Port of Alaska dock face and terminals accessible for shipping traffic at all times, and the contractor furnishes all labor, equipment, supplies, materials, supervision and other items and services necessary to accomplish the work.
We post new uncategorized opportunities in Alaska as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"99506-0898""ANCHORAGE""AK""USA""CONTRACTING OFFICE KO""2204 3RD STREET""https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W911KB27RA002¬iceType=SolicitationNotice"0"link""1""2026-11-05T21:34:36.611+00:00""449785c3f2e04e22a1deab35967849a5""public""0""PIEE Solicitation Module Link for W911KB27RA002""public""a5110c18bade4b29a1c5adf8d97d1dd7""0"4"0""https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml"0"link""1""2026-11-05T21:34:36.611+00:00""a523b98d748b45d294d56bf0715f45cc""public""0""Web Based Training for the PIEE Solicitation Module""public""e58bd718e78d4e4d86012651d414c025""0"3"0""https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf"0"link""1""2026-11-05T21:34:36.611+00:00""0864e32f52fc4dd9972d93d150c65aba""public""0""Registration Instructions for the PIEE Solicitation Module""public""c6ea7f5aa53044338272fba3501f736f""0"2"0""https://toolbox-piee.eb.mil/"0"link""1""2026-11-05T21:34:36.611+00:00""3e04ef6c31db4f99a3c76b479ccc193c""public""0""Department of Defense Procurement Toolbox""public""7b1a5cfe67ec4c6ebf2f4921042dd87d""0"1"0"Most Alaska work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 61f054fab3bc46cabc42e244076aa4aa), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.