Project is located in Mather, CA. Includes all work to install a sampling gauge hatch on a manway, install a clock type mechanical gauge on a manway, recoat the exterior of the tank, replace the collision barriers, add a catwalk that extends across the
entirety of the tank, and replace the audible and visual alarms.
o Fix the remote containment basin drainage issue.
o Replace the asphalt on the NE side of the fueling facility.
o Repair the refueler parking concrete.
o Replace the dispenser fuel monitor with a non-coalescing filter and install a water draw off system with a hand pump.
o Replace the asphalt near the loading/unloading facility with a concrete path.
o Replace POL building of the same size and at the same location.
o Complete supplying, installation, and testing ATG system on Fuel Storage Tank, AVGAS.
o Relocate the generator that is inside the compartmentalized area.
The work includes installing a sampling gauge hatch on a manway, installing a clock type mechanical gauge on a manway, recoating the exterior of the tank, replacing the collision barriers, adding a catwalk that extends across the entirety of the tank, and replacing the audible and visual alarms. It also includes fixing the remote containment basin drainage issue, replacing the asphalt on the NE side of the fueling facility, repairing the refueler parking concrete, replacing the dispenser fuel monitor with a non-coalescing filter and installing a water draw off system with a hand pump, replacing the asphalt near the loading/unloading facility with a concrete path, replacing the POL building of the same size and at the same location, completing supplying, installation, and testing of an ATG system on a Fuel Storage Tank (AVGAS), and relocating the generator that is inside the compartmentalized area. Optional items include stockpiling and disposal of petroleum contaminated soil, disposal of lead-based paint, and disposal of asbestos containing material.
We post new asphalt opportunities in California as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"68102-4901""OMAHA""NE""USA""KO CONTRACTING OFFICE""1616 CAPITOL AVENUE""Solicitation - W9128F27RA045.pdf"6340907"file"".pdf""1""2026-11-23T21:09:03.071+00:00""57cd563f24604e7bb103d747aebdda77""public""0""public""ef079d481c2b44cc83528a80795c65d6""0"26"0""Solicitation - W9128F27RA045.pdf"7643970"file"".pdf""1""2026-10-22T20:53:15.397+00:00""65ec200884e8407e9a01ee4505e16825""public""2026-11-23T21:09:03.071+00:00""1""public""2fcbd5dcad19472e8ed1d1f52a56c4b2""0"25"0""2026-11-23T21:09:03.071+00:00""27-R-A045-Specs.pdf"7926748"file"".pdf""1""2026-10-22T20:53:15.397+00:00""b4b1193e2c024a61baab6283d52a2237""public""0""public""c4fcd8b3009a49048fc97b3b450ced95""0"20"0""Davis Bacon Wage Determinations - CA20260007.pdf"238147"file"".pdf""1""2026-10-22T20:53:15.397+00:00""7a86d8d9e872489a8e5c44069fc909b4""public""0""public""58903b99589f499f9f0f86dd391c84ae""0"16"0""Mather Selection Criteria - Rev 2.pdf"267051"file"".pdf""1""2026-10-23T16:19:37.901+00:00""cf207897648a466195586238ffd164bd""public""0""public""2d5ceacac8b74100a0b871d1af2521d0""0"12"0""RFP Drawings.pdf"3157785"file"".pdf""1""2026-10-22T20:53:15.397+00:00""af544e5a711e41eca684398da99fe2d4""public""0""public""e093f6f13242451893365bfd81c378a9""0"11"0"Most California work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 616764bb1a97432d8ac63a5c61cee2b3), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.