Solicitation for Elevator Upgrades, Jesse Brown VAMC.
The contractor must provide all tools, materials, components, labor, and supervision to upgrade the interiors of elevators P-7B, P-8B, P-9B, and freight S-10B at Ogden Pavilion, Jesse Brown VA Medical Center. The work includes upgrading the floor, wall panels, ceiling, lights, and handrails to match the interior of cab P-6B. The freight elevator S-10B is to have a protective curtain. The project also includes demolition of existing floor tiles and reinstallation of new tiles in cab P6B. The contractor must comply with ASME A17.1 and all applicable VA codes and standards. At least 3 elevators must remain functioning during construction.
We post new carpentry/glaziery opportunities in Wisconsin as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""53214""MILWAUKEE""WI""USA""GREAT LAKES ACQUISITION CENTER""115 S 84TH ST""36C25226B0033 0002.docx"120200"file"".docx""1""2026-09-16T20:11:28.781+00:00""a92e150d1ef04016a7bcef4bf6778c0e""public""0""public""cfb04251ee72484588231eeaf2376895""0"20"0""36C25226B0033 0001 - Issued.docx"122580"file"".docx""1""2026-09-11T13:59:23.432+00:00""bc587fd1bc96463091bd802eb6b7e0cd""public""0""public""556f960001c2494b8edb6edb4b8b0e1d""0"19"0""Amend 0001 - Virutual Bid Opening Info (1).docx"25471"file"".docx""1""2026-09-11T13:59:23.432+00:00""bc8e54659fc94f18b50c270c86a0a592""public""0""public""1162b1405362419ab87951c4e8ff12cf""0"18"0""S02 - 852.219-75.docx"18108"file"".docx""1""2026-08-24T20:31:54.484+00:00""e598075886fa4befbe31950c730871a5""public""0""public""5d2befe5d8fb41fe8c5827287104e9dc""0"17"0""S02 - Elevator Interiors - Wage Rates.pdf"72319"file"".pdf""1""2026-08-24T20:31:54.484+00:00""34030efa6fc94197aa59ee66c0ce86e1""public""0""public""c36ba06cb516485289d82bc0bcbd5677""0"16"0""S02 - SOW Att Submittal 39_1 Cab 6 Design Finalized - REVIEWED.pdf"3811087"file"".pdf""1""2026-08-24T20:31:54.484+00:00""e1caedf3df794e4eafb5aefaa9e7c8ef""public""0""public""c67c2f39a6da477596c74459fb6d405d""0"15"0""S02 - SOW Att Photos of elevator cabs 4of4.docx"8105032"file"".docx""1""2026-08-24T20:31:54.484+00:00""5fcabc7d8220440686763103482d6eba""public""0""public""e5ba049e349044d2a1fba6d50b4389d6""0"14"0""S02 - SOW Att Photos of elevator cabs 3of4.docx"9739728"file"".docx""1""2026-08-24T20:31:54.484+00:00""5ca934d0bc804f0a866ab25856650808""public""0""public""eeec5201989d40a599d5db189e1b61b2""0"13"0""S02 - SOW Att Photos of elevator cab P6B.docx"2735764"file"".docx""1""2026-08-24T20:31:54.484+00:00""43990fd35ecb46039a5a7f6ab2576726""public""0""public""787501af9c554b7aba77e71bfdcbede8""0"12"0""S02 - SOW Att 43_1- Cab 6B flooring - REVIEWED.pdf"4676009"file"".pdf""1""2026-08-24T20:31:54.484+00:00""901903db0add4cf6a3b4afd862d636b1""public""0""public""e25311fcfcb94d50881a039b536702f7""0"11"0""S02 - SOW Att Photos of elevator cabs 2of4.docx"8077112"file"".docx""1""2026-08-24T20:31:54.484+00:00""198d72d4915f4a1db21b7528f14c5ed9""public""0""public""8eb75256c28345de905bad29f375c177""0"10"0""S02 - SOW Att - Submittal 46 Revised Infection Control Plan.pdf"8731350"file"".pdf""1""2026-08-24T20:31:54.484+00:00""82677ffc9b354b04a084532d97b196fc""public""0""public""ee66cb53cc2947f6a41cccc7b26dd67f""0"9"0""S02 - SOW Att - SOW Photos of elevator cabs 1of4.docx"7573976"file"".docx""1""2026-08-24T20:31:54.484+00:00""40e5010e99374f60ae7ec11acb76d4bf""public""0""public""836ab00ed3ed401591ae5f464b340a8f""0"8"0""S02 - SOW Att - Ogden elevator 537-21-101 ICRA renewal 6_2025.pdf"482146"file"".pdf""1""2026-08-24T20:31:54.484+00:00""911bcba61f11497cb033a4c85906d99b""public""0""public""62fa3e660d2249829b8e5152964152e5""0"7"0""S02 - SOW Att - Asbestos Survey Report.pdf"10407854"file"".pdf""1""2026-08-24T20:31:54.484+00:00""b440aeae72984b18bf654353015fb978""public""0""public""b2ef1e15107d4370a8422d0351e66fe7""0"6"0""S02 - 537-26-101 SOW Att - Contractor Production Report.pdf"89220"file"".pdf""1""2026-08-24T20:31:54.484+00:00""1948eb61083146a1b95e5eb9e044b7b9""public""0""public""89a8b48a08504441b402ef515b38ca71""0"5"0""S02 - 537-26-101 SOW Att - Subcontractor Payment Summary.xlsx"12981"file"".xlsx""1""2026-08-24T20:31:54.484+00:00""0d46d482f3c34c558fc6700f896c50dc""public""0""public""d229b3e7df254cd1b832aaec897b8923""0"4"0""S02 - 537-26-101 SOW Att - Contract Progress Report.pdf"542247"file"".pdf""1""2026-08-24T20:31:54.484+00:00""870074691d0d47868c33e50c31228ed9""public""0""public""0cd9e5729f73434c94a3f68318ff8d20""0"3"0""S02 - SOW_Final_6.26.26.pdf"357173"file"".pdf""1""2026-08-24T20:31:54.484+00:00""ceb61e161eac4b7ebb92a9fcb10edc2e""public""0""public""bdb87c59cf1e4f07b471d3030f80ca1f""0"2"0""36C25226B0033_1.docx"129512"file"".docx""1""2026-08-24T20:31:54.484+00:00""908dce5ede4244c299422df694e45ac5""public""0""public""a3b0eebe0d9040f089a390b517c7e8dd""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 60306691b906409e86a987029c67f210), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.