CONSTRUCTION STATEMENT OF WORK
Install Roof Equipment Railings
Project No. 539-22-206
The Contractor shall provide all tools, equipment, material, permits, labor, and supervision required to completely perform the required construction work for the Install Roof Equipment Railings project, including prepare site for building operations, demolition and removal of existing structures, furnish labor and materials and perform work as required by drawings and specifications.
Work includes carpentry and roofing work, and certain other items shown and specified in project drawings and specifications.
This construction project will install various rooftop safety railings and work platforms at the Cincinnati VA. This work includes general construction, roofing, abatement, etc.
The above construction Statement Of Work (SOW) constitutes a basic outline of work and in no way outlines all of the details for the construction of this project. It is recommended that a detailed inspection of the premises, drawings and specifiction be initiated to determine the needs and conditions for the construction of this project.
Period of Performance: All phases of work completed within 240 calendar days after issuance of the Notice to Proceed.
The contractor shall provide all tools, equipment, material, permits, labor and supervision to perform the Install Roof Equipment Railings project, including preparing the site for building operations, demolition and removal of existing structures, and furnishing labor and materials as required by drawings and specifications. Work includes carpentry and roofing work, general construction, roofing and abatement to install various rooftop safety railings and work platforms at the Cincinnati VA.
We post new carpentry/glaziery opportunities in Ohio as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""45428""DAYTON""OH""USA""VISN 10 CONSOLIDATED CONTRACTING""4100 WEST 3RD STREET""36C25027B0008.docx"15130"file"".docx""1""2026-11-09T03:00:47.988+00:00""e3dd6d65448648deb31fe143b1edd583""public""0""public""9be51b33d4654418b8e241b04497af43""0"1"0"Most Ohio work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 5afe716a38494a6f84b1e84205805f86), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.