The purpose of this project is to renovate two Cystoscopy rooms (214 and 215), Procedure Room (212), Procedure Room (211), Check-In area, Office, Control, Vestibule, Dressing, Toilet and Corridor. The two Cystoscopy rooms (214 and 215) will also receive new medical equipment.
The Buffalo VAMC requires a Contractor to perform construction work necessary to accomplish this goal. The anticipated Construction Period of Performance is estimated to be 720 days.
This effort intends to perform site preparation renovations to support the installation of new medical equipment. The Contractor shall prepare rooms 214 and 215 to receive new equipment. A control room (215-1) is included and an electrical room (214-1) with new electrical panels and equipment is included in the design. In addition, Procedure Rooms 212 and 211, a stretch alcove, a check-in area, office, dressing area and restroom are included in this scope of work
The contractor shall perform site preparation renovations to support the installation of new medical equipment. This includes preparing rooms 214 and 215 to receive new equipment, renovating Procedure Rooms 212 and 211, a check-in area, office, dressing area, restroom, and corridor. The work involves HVAC replacement (AHU-5, ductwork, coils), new plumbing systems (domestic water, medical gas), finishes (lead shielding, epoxy flooring, hard ceilings), electrical work (LED lighting, telecom, fire alarm), structural work (equipment base plates), fire protection (new sprinkler heads), and relocation of clinical operations for temporary spaces. The contractor must also provide a third-party commissioning agent for HVAC, plumbing, and fire suppression systems.
We post new general contractors opportunities in New York as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""12208""ALBANY""NY""USA""113 HOLLAND AVE""36C24226B0065 0004.pdf"142556"file"".pdf""1""2026-11-17T17:34:55.092+00:00""3caa9a59a8334172beca1594128a37a2""public""0""public""f7e7bcdacb9d498ca51b7ef28c9feb38""0"9"0""Bid walkthrough attendence form.pdf"501498"file"".pdf""1""2026-11-02T16:10:42.91+00:00""09de6039ee0947038d81d1d033ff691b""public""0""public""ddedf6eecdb44613a0cf9177d0a6291b""0"8"0""36C24226B0065 0003.pdf"177623"file"".pdf""1""2026-11-02T16:10:42.91+00:00""26ba479e08fe4e509e6fec47daae9b7e""public""0""public""4dceda1af84c4b33a8e5353a5ede2c57""0"7"0""36C24226B0065 0001.docx"23572"file"".docx""1""2026-10-20T18:24:33.348+00:00""458ad113ab9944e182f44b1f162400b4""public""0""public""26d8b76e87f74e22a256d7bab80de5bd""0"6"0""FAR 52.225-2 Buy American Certification.pdf"127626"file"".pdf""1""2026-10-19T17:55:33.72+00:00""8383f9fec3fc4bd2831f48da20c928c3""public""0""public""0bde4198b5034cf3bf1f44b6a8364db1""0"5"0""UPDATED-528-19-102-BuffaloUrology Combined Specifications 05-18-2026.pdf"13011711"file"".pdf""1""2026-10-19T17:55:33.72+00:00""d604bcb2b94f4c90aab273da7fedda87""public""0""public""38d5b1c7dc31490c8b66338a32869546""0"4"0""Facility Approved Finishes and Devices.pdf"89796"file"".pdf""1""2026-10-19T17:55:33.72+00:00""ebec78cfefa44bada336b3105daa29f6""public""0""public""8a2dc9b5174c43e291bc8015d0def358""0"3"0""UPDATED- Final Construction Drawings-2_01.pdf"84277365"file"".pdf""1""2026-10-19T17:55:33.72+00:00""12e30c9e349d4717a265927c68360868""public""0""public""ae57c1ade21d4b329f099875fca4a6ea""0"2"0""36C24226B0065_1.docx"7061072"file"".docx""1""2026-10-19T17:55:33.72+00:00""bf084085a82e48729985df40a9d6e428""public""0""public""2977d60b637143ff96c74f86cbdbba47""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 5ac8feb514b044fcb2b3f5bae2e42baf), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.