We'll email you new exterior maintenance opportunities as agencies publish them — free, unsubscribe whenever.
And get prequalified now, so the bond is never the scramble on the next one. Prequalify for bonding →
Wild Horse and Burro Adoption Office-Blackwater Cleanup and Restoration
The contractor shall furnish all labor, materials, equipment, supervision, and incidentals necessary to perform the cleanup and restoration. Work includes: Task 1 – Site Assessment and Hazard Controls; Task 2 – Blackwater Removal and Extraction; Task 3 – Removal of Damaged Materials (including approximately 600 sq ft of sheet rock, 80 linear feet of vinyl baseboards, 100 linear feet of wood base boards, 100 sq ft of vinyl flooring); Task 4 – Cleaning, Sanitizing, and Disinfection; Task 5 – Dry-Out and Environmental Stabilization; Task 6 – Restoration and Repairs (including replacing drywall, flooring, base trim, repainting, reinstalling fixtures); Task 7 – Final Inspection and Clearance. The contractor must also clean and seal a small exterior shed (approximately 12-foot x 20-foot x 8-foot) for rodent and reptile access.
"Sol_140LL027Q0029.pdf"535974"file"".pdf""1""2026-11-16T20:18:39.188+00:00""90c96e6fa1634ae79931fa6f5d6c7bea""public""0""public""05218f2f8a024cffac34bd8c38cc4ecc""0"2"0""B03_Wage_Determination_SAM_gov.pdf"480424"file"".pdf""1""2026-11-16T20:18:39.188+00:00""9c2c371661724c8cbe6ab1de1caa335a""public""0""public""da7f6f52a10447d58163e3a494556963""0"1"0"Most public work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 59a1b9d952444f5f9c7f54f69dda7d5d), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.