USACE Louisville District issues this Request for Qualifications (RFQ) to identify and select the single most highly qualified Design-Build Team to execute the United States Space Force (USSF) Integration Facility (UIF) project at Wright-Patterson Air Force Base (WPAFB), Ohio.The project provides a new, multi-floor, approximately 333,700-square-foot secure USSF Integration Facility and a physical connection to active Building F/10854. The project includes site work; utility distribution integration; high-efficiency HVAC and other MEP systems designed for continuous operations; replacement of two (2) existing end-of-life 2000 kW backup generators; high-security electrical switchgear; a secure structural and envelope system; specialized controlled spaces, commissioning, and accreditation activities.The Government will provide available concept design information, programmed requirements, and initial planning data as the initial technical baseline. During Phase 1, the selected Design-Builder will validate that baseline and may recommend refinements. Any material deviation from the Government baseline requires Government review and approval.Sustained Mission Readiness: Building F/10854 will remain fully occupied and operational throughout construction.
The Design-Builder must plan and execute all work to avoid unscheduled interruption of 24/7 mission operations, utilities, communications, and existing secure-facility accreditation.
The project provides a new, multi-floor, approximately 333,700-square-foot secure USSF Integration Facility and a physical connection to active Building F/10854. The project includes site work; utility distribution integration; high-efficiency HVAC and other MEP systems designed for continuous operations; replacement of two (2) existing end-of-life 2000 kW backup generators; high-security electrical switchgear; a secure structural and envelope system; specialized controlled spaces, commissioning, and accreditation activities. The Government will provide available concept design information, programmed requirements, and initial planning data as the initial technical baseline. During Phase 1, the selected Design-Builder will validate that baseline and may recommend refinements. Any material deviation from the Government baseline requires Government review and approval. Sustained Mission Readiness: Building F/10854 will remain fully occupied and operational throughout construction. The Design-Builder must plan and execute all work to avoid unscheduled interruption of 24/7 mission operations, utilities, communications, and existing secure-facility accreditation.
We post new general contractors opportunities in Kentucky as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"40202-2230""LOUISVILLE""KY""USA""KO CONTRACTING DIVISION""600 DR MARTIN LUTHER KING JR PL""https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W912QR279A005¬iceType=SolicitationNotice"0"link""1""2026-11-24T20:59:09.122+00:00""44fa669344194133a81eea9fd2302bb9""public""0""PIEE Solicitation Module Link for W912QR279A005""public""231b971231a34cf6a4c4c3a5a370254e""0"4"0""https://piee.eb.mil/wbt/xhtml/wbt/sol/index.xhtml"0"link""1""2026-11-24T20:59:09.122+00:00""24d7c9ad5fdb44cf80b46310a0d803c3""public""0""Web Based Training for the PIEE Solicitation Module""public""275e8d8fc7fd4a5895e258f048fe6577""0"3"0""https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf"0"link""1""2026-11-24T20:59:09.122+00:00""80a024516fb34077ab362aae37a369c0""public""0""Registration Instructions for the PIEE Solicitation Module""public""c8b0bed244ea4708b3780aa2d56a491f""0"2"0""https://toolbox-piee.eb.mil/"0"link""1""2026-11-24T20:59:09.122+00:00""fb06481fc9194a74bd49caa9eac50bff""public""0""Department of Defense Procurement Toolbox""public""fb60f41d594541a48a4c314feef599d3""0"1"0"Most Kentucky work asks for the two below, and the solicitation documents are where it’s stated. Apply straight through for it — or prequalify once and skip the application on both.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 57d95e88e0ae4620971e90b4c5a6fa21), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.