The Contractor shall provide all labor, materials, certified personnel, equipment, and tools necessary to perform the annual and triennial ADEQ-mandated Underground Storage Tank (UST) testing, inspection, certification, compliance documentation, and reporting for the Phoenix VA Health Care System. All work shall comply with ADEQ requirements, EPA 40 CFR Part 280, NFPA 30/30A, and VA environmental and safety policies.
The contractor shall provide all labor, materials, certified personnel, equipment, and tools necessary to perform annual and triennial ADEQ-mandated Underground Storage Tank testing, inspection, certification, compliance documentation, and reporting for three emergency diesel USTs at the Phoenix VA Health Care System. Annual work includes ATG system certification, walkthrough inspections of spill buckets, fill areas, containment sumps and monitoring wells, line leak detector testing, line tightness testing, and ADEQ reporting. Triennial work includes spill bucket testing, containment sump integrity testing, overfill prevention equipment testing, and ADEQ documentation package submission, plus emergency repairs, emergency call-out troubleshooting, and additional reports. All work shall comply with ADEQ requirements, EPA 40 CFR Part 280, NFPA 30/30A, and VA environmental and safety policies.
We post new transportation & logistics opportunities in Arizona as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""90815""LONG BEACH""CA""USA""4811 AIRPORT PLAZA DRIVE""SUITE 600""VA10091 Vendor Request Form.pdf"117872"file"".pdf""1""2026-10-09T22:26:58.567+00:00""1fc6b67119ed4dfdb71740633ee7fec2""public""0""public""2b09c734bd6e4a389efe8e04e7949f30""0"3"0""W9 Request for Taxpayer Identification Number and Certification.pdf"140815"file"".pdf""1""2026-10-09T22:26:58.567+00:00""5907171c9aeb44e09f315ccf21175e56""public""0""public""4c2d02a9bfe24975a32039e2f82a5e94""0"2"0""S02. RFQ 36C26226Q1039_1 ADEQ Compliance Underground Fuel Storage UPDATED.pdf"727850"file"".pdf""1""2026-10-09T22:26:58.567+00:00""0d63d05a1ce84fb2937f104b67f3219c""public""0""public""e442b7a0c6c34a23b481fa6505f0ab33""0"1"0"Most Arizona work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what an agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 56edadb953684af59ea21ff7a79ed811), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.