Delivery and Installation of Wayfinding and Emergency Signage U.S. Embassy Vienna
The Contractor shall provide all labor, supervision, design-development coordination, materials, equipment, transport, tools, access equipment, fasteners, and incidentals necessary to produce and install a complete wayfinding and emergency signage system at the U.S. Embassy Vienna compound. The finished work shall include delivery and installation and must follow the Government-furnished sign schedule, location plans, evacuation plans, and the applicable OBO signage design intent for sign types SF02 and SR02.
Required Signs and Quantities
Category / IDs; Type; Nominal size (W x H); Qty.; Key requirement
Exterior: SF02; 450 x 450 mm; 3 units; Six long and six short interchangeable sections per sign.
Exterior spare inserts: SF02 - To match exterior signs; 12 units; Blank interchangeable sections.
Interior directional: SF02; 400 x 350 mm; 15 units; Six long and six short interchangeable sections per sign.
Building directory: SF02; 400 x 1200 mm; 1 unit; Twenty-six long and twenty-six short interchangeable sections.
Evacuation plans: SR02; 400 x 350 mm; 10 units; Fixed graphic panels; reproduce the Government-furnished evacuation plan content for each location.
Emergency alarm tones: SR02; 230 x 400 mm; 10 units; Fixed graphic panels; two signs on each of Levels 0-4.
Interior spare inserts; SF02 - To match interior signs; 24 units; Twelve blank long inserts and twelve short arrow inserts.
Use the Government-furnished sign IDs, destinations, floor designations, arrows, building-directory entries, evacuation graphics, legends, emergency symbols, and alarm-tone content. The Contractor shall verify each message and orientation against the location plans before fabrication.
SF02 wall-mounted directional signs shall follow the OBO SF02 design intent, including interchangeable message sections, directional symbols, cropped seal where shown, Calibre typography, and translation only where required for areas accessible to the general public.
SR02 alert signs shall follow the OBO SR02 design intent: painted acrylic border and face panels, direct-printed text/graphics, concealed mechanical fastening, and the applicable regulatory, warning, or explanatory border treatment.
Signs shall be durable, cleanable, non-glare, colorfast, and suitable for the intended interior or exterior location. Exterior assemblies and fixings shall be weather resistant and corrosion resistant.
All work and deliverables as per attached Scope of Work and supporting documents.
The Contractor shall provide all labor, supervision, design-development coordination, materials, equipment, transport, tools, access equipment, fasteners and incidentals to produce, deliver and install SF02 directional and directory signs and SR02 evacuation-plan and emergency alarm-tone signs per the Government-furnished sign schedule, location plans, evacuation plans and OBO design intent, including field verification, coordinated artwork and shop drawings, samples and mock-ups, fabrication of signs and spare inserts, installation level, plumb and securely anchored, and closeout with as-installed schedule and editable artwork.
We post new food & catering opportunities as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""20520""WASHINGTON""DC""USA""DEPARTMENT OF STATE, 2201 C ST NW""19AU9027Q0002_Cover Ltr.pdf"596043"file"".pdf""1""2026-11-02T13:17:07.174+00:00""0a6b8819d2f24b34ab628c20e2cf6eb8""public""0""public""3b4456cf49c940a59b4fecd18693a986""0"13"0""19AU9027Q0002_SF-1449.pdf"1013063"file"".pdf""1""2026-11-02T13:17:07.174+00:00""e7537f16051c4007827a8a75555553dd""public""0""public""83ef7add14574264937436fb1e8f57b3""0"12"0""19AU9027Q0002_SolicitationDoc.pdf"679910"file"".pdf""1""2026-11-02T13:17:07.174+00:00""6804a33b44a3456dba59e61c5279ebb2""public""0""public""f3caed9e9b4347ae81c4cb13889c8016""0"11"0""19AU9027Q0002_SOW.pdf"174448"file"".pdf""1""2026-11-02T13:17:07.174+00:00""210a733c49ea4e6fb78a0502f72d1d29""public""0""public""d108103e19c14a148f8549bd0c45be1a""0"10"0""19AU9027Q0002_Attachment A_count_details.pdf"52508"file"".pdf""1""2026-11-02T13:17:07.174+00:00""662a34c16cbe47f4b9e9c02be21967c9""public""0""public""364077bab2d3461a83a5155d214606ee""0"9"0""19AU9027Q0002_Attachment B_Location detail.pdf"14195517"file"".pdf""1""2026-11-02T13:17:07.174+00:00""83d0056ffb5a40f9946dec0b44ea1b58""public""0""public""cf5d6369211945a6af764ebe848f8087""0"7"0""19AU9027Q0002_Attachment C_EvacPlan.pdf"8148111"file"".pdf""1""2026-11-02T13:17:07.174+00:00""70e008fbdd3a46abb0d9d03f52879ce4""public""0""public""6001f01213f446e6bfe179583cc162e3""0"5"0""19AU9027Q0002_Attachment D_OBO Extract.pdf"1888270"file"".pdf""1""2026-11-02T13:17:07.174+00:00""1285701f485c4926b9307d6bbab8f52d""public""0""public""019f35dcf67d49e8b1b43b37a8597688""0"4"0"Most public work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what an agency asks to see before they take your bid seriously.
Source: SAM.gov (notice 556fff2a74a24be49aa019d845bef416), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.