Amendment: 1
Bonding Requirements:
An offer guarantee IS required
Contractor must furnish any required performance and payment bonds within 10 calendar days after receipt of order (ARO)
The contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary to construct the CJAG Load Line 6 Electrical System.
The requirement includes construction of approximately 1,400 linear feet of underground medium-voltage electrical service terminating at a new pad-mounted transformer at the Load Line 6 area of Camp James A. Garfield Joint Training Center.
The contractor shall perform all work in accordance with Attachment 1, including all requirements for utility coordination, route surveying, underground utility location, trenching, conduit installation, concrete encasement, backfill and compaction, cable installation, transformer installation, grounding, testing, energization, restoration, quality control, safety, security, and required deliverables.
Site Visits are encouraged, call 1SG Brian Persing 330-984-8130 or CW2 Grant Stoner 614-336-6580. Do not contact these individuals for any reason other than coordinating site visit.
The contractor shall construct approximately 1,400 linear feet of underground medium-voltage electrical service terminating at a new pad-mounted transformer at the Load Line 6 area of Camp James A. Garfield Joint Training Center. Work includes utility coordination, route surveying, underground utility location, trenching, conduit installation, concrete encasement, backfill and compaction, cable installation, transformer installation, grounding, testing, energization, restoration, quality control, safety, security, and required deliverables. The contractor shall perform all work in accordance with Attachment 1, the Performance Work Statement.
We post new electrical opportunities in Ohio as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"43235-2712""COLUMBUS""OH""USA""KO FOR OHARNG DO NOT DELETE""2811 W DUBLIN GRANVILLE ROAD""Combined Synopsis Solicitation_Power Distribution_Amendment1.docx"31857"file"".docx""1""2026-09-09T12:36:17.133+00:00""52ab954935664a23a1f8d8ad05f154d8""public""0""public""66e0b97b830847ea93090076f781e246""0"3"0""PWS_Electrical Installation_V2.docx"63906"file"".docx""1""2026-09-08T22:19:17.697+00:00""505fffca33e140f8893689ac8297e2ef""public""0""public""dde996c37be2469f8f461069d33f7987""0"2"0""Combined Synopsis Solicitation_Power Distribution.docx"31812"file"".docx""1""2026-09-08T22:19:17.697+00:00""2da046a3b9324a4f8313add0cc0971f1""public""0""public""ea17e1c51b024ef0867dce00eef24634""0"1"0"Most Ohio work asks for the two below, and the solicitation documents are where it’s stated. Here’s what each costs through Light RFP if you need one.
Source: SAM.gov (notice 55293ae6c4424fb8a8d21c00df2a01b0), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.